The Bark Canoes and Skin Boats of North AmericaChapelle, Howard Irving
History
The Bark Canoes and Skin Boats of North America
Chapelle, Howard Irving
Canoes and canoeing -- North America; Indians of North America -- Boats; Skin boats -- North America
THIRD STAGE OF CANOE CONSTRUCTION: the bark cover is shaped on the
building bed. The gores have been cut; part of the cover is shaped and
secured by stakes and battens. "A" shows battens secured by sticks
lashed to stakes. (_Sketch by Adney_.)]
In an independent group, the ends of the strand were treated as in
whipping, the tail being under the first turns made and the end tucked
back under the last--usually on the inside of the gunwales. Where there
were inner and outer gunwales the lashing was always around both,
and the tail might be jammed between them. If a cap was used on the
gunwales, the lashings were always under it. The use of a knotted turn
to start a lashing occurred only in the old Têtes de Boule canoes.
On the Malecite canoe, the sides are pieced out in one to three panels
rather than in one long, narrow panel on each side. The panel for the
midlength requires the greatest strength and is usually lapped inside
the bottom bark. The latter is first trimmed straight along its edge,
and the panel inserted behind it with a couple of inches of lap. Then
the two pieces of bark are sewn together over a halved-root batten with
an over-and-over stitch. (Other tribes used some form of the harness
stitch, or a similar style, allowing great strength.) The middle panel
does not extend much beyond the ends of the first pair of thwarts on
each side of the middle. The next panels toward the ends are lapped
outside the bottom bark and are sewn with the back-stitch. Then,
if still another panel is required at each end, this too is lapped
outside and is sewn in the lap with an in-and-out stitch. The ends of
the panels are usually sewn with an over-and-over stitch that runs
square with the seam outside and diagonally to it inside the bark. (The
harness stitch was used here by some tribes, as were many forms of the
cross-stitch.) The ends of the canoe and the gores have already been
sewn during an earlier stage of the building process.
Once the sides are pieced out, the bark is ready to be turned up and
around the gunwale frame and clamped perpendicularly. To effect this,
small stakes are made by halving saplings, so that each half is about a
half inch thick. The butt of each half is cut chisel-shaped, with the
bevel on the flat side; the rounded face is smoothed off, and it may
be tapered toward the head of the stake. Between two of the slashes
a length of bark is now brought up against the outer stakes; against
the bark the small, inside stake is placed with the round face of the
chisel-pointed butt wedged against the outer face of the gunwale. The
top is then levered against the outside stake, so that the flat face of
each clamps the bark in place. The top of the inner stake is then bound
to the outer.
[Illustration: Figure 39
CROSS SECTION of canoe on building bed during third stage of
construction (above) and fourth stage. (_Sketch by Adney._)]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account