Vietnam War, 1961-1975 -- Campaigns -- Vietnam -- Khe Sanh
With the arrival of the 3d ARVN Airborne Task Force, all maneuver
elements involved in PEGASUS were on the Khe Sanh Plateau. On the 8th,
the three South Vietnamese battalions (minus one company) leapfrogged
from Quang Tri to LZ Stud and then conducted a helicopter assault into
LZ Snake about 2,000 meters southwest of the base. In effect, the
encirclement was complete; only, this time, pressure was being applied
in the opposite direction. As the Allied oil slick spread over the
valley, the Americans and South Vietnamese uncovered ghastly evidence
of how badly the NVA had been beaten. The various units found hundreds
of North Vietnamese in shallow graves; hundreds more lay where they
fell. A total of 557 individual weapons, 207 crew-served weapons, and
2 antiaircraft pieces were either captured or destroyed. In addition,
17 vehicles, ranging from PT-76 tanks to motor scooters, and tons of
ammunition, food, radios, and individual equipment were discovered. The
mountains of captured or abandoned enemy stores indicated that either
Operation PEGASUS had caught the NVA completely flat-footed or the
remnants of the two enemy divisions were in no shape to cart off their
equipment and supplies.(211)
Even though the rest of the operation centered around completing
work on Route 9 and sifting through the debris of battle, there were
several contacts with the retreating enemy. On 8 April, the ARVN forces
turned back an NVA counterattack west of the base and killed 78 in the
process. The same day, the 1st Battalion, 9th Marines, assaulted and
seized Hill 689 with no opposition but discovered 37 NVA killed during
a fight the previous night. Air and artillery also hammered away at the
NVA; on one occasion, a U. S. Army airborne observer spotted 100 North
Vietnamese in the open and called in artillery fire which accounted for
30 of the enemy. While the NVA pulled away to the west, the engineer
task force crept toward the base from the opposite direction, and at
1600 on 11 April, Route 9 was officially declared open. The engineers
had repaired 14 kilometers of road, replaced 9 vital bridges, and
constructed 17 bypasses; General Westmoreland applauded their feat as
"herculean."(212) (See Maps 8 and 9).
[Illustration:
MAP 8 K.W. WHITE
OPERATION PEGASUS]
[Illustration:
MAP 9 K.W. WHITE
OPERATION PEGASUS]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account