+192. The lot-card.+--The Cheddar process involves several hours of
manipulation and includes many details which should be closely and
accurately observed and recorded. The necessity of carrying observations
of several different factors at the same time makes a scheme of
recording data essential to convenient work. For this purpose, a
lot-card for Cheddar cheese is introduced here and the pages given to
particular factors are indicated in the space intended for the recording
of observations. The manufacture of Cheddar cheese is a complicated
process, because several factors must be given attention at the same
time. A careful record of the observations of each step in the
successive handling of each lot of milk puts the operator in possession
of a permanent record of his experience. This record has several uses.
It may help to convince patrons of the importance of eliminating faults
in the milk; it furnishes the cheese-maker a cumulative record of his
experiences in handling milk with special qualities, such as high or low
fat-content, over-acidity or taints. Since Cheddar ripening covers a
period of weeks and months, no operator can remember particular lots of
milk sufficiently well to be able to use his experience on the
interpretation of the qualities found in the ripened product.
[Illustration: FIG. 29.--Delivering milk to the cheese factory.]
+193. The milk.+--It is the usual practice to deliver the milk to the
cheese factory each morning (Fig. 29). The night's milk is cooled and
kept clean and cold until delivered at the factory. It is advisable not
to mix the cold night's milk and the warm morning's milk, but to deliver
them in separate cans to the cheese factory at the same time. The milk
is weighed, sample for fat test taken and then run into the vat (Fig.
30). The receiving or taking in of the milk is one of the most important
parts of the cheese factory work. It is practically as important as the
actual manufacturing of the cheese.
+21 CHEESE.+ This card must remain with lot ........... from the milk room
until the finished product is ready to leave the building, then it should
be handed to instructor.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account