[Illustration: Wherever possible, every space and crevice outside the
iron lining is filled with cement forced, in a liquid state, through
the iron lining by compressed air. This photograph shows the operation
of “grouting,” as it is called. The man at the left is in control of
the grouting. He has the hose, through which the grout is forced,
screwed to a pipe which passes through a hole made for the purpose in
the iron lining plates and called a “grout hole.” The two men in the
middle of the picture are attending to the “grouting machine” by which
the work is done. Water and cement are fed into the small boiler-like
tank, the tank closed and compressed air admitted thus blowing the
liquid cement through the hose and behind the iron lining. When no
more grout can be forced behind the iron lining all the space has been
filled. The man on the right is the engineers’ inspector taking note of
how much grouting is done, and seeing that the work is properly carried
out.]
[Illustration: This shows the process by which the iron lining is made
perfectly water-tight, so that, when the compressed air is taken off,
no water at all can get into the tunnel. Two operations are shown here.
One is called “grommetting the bolts,” the other is called “caulking
the joints.” The two men on the left, hanging on to the wrench, are
tightening up the bolts as tight as they can after having put on,
underneath the washers at the head and nut of each bolt, a ring of
spun yarn dipped in red lead and oil or tar or some such water-proof
material. A few of these “grommets” may be seen at the feet of the
third man from the left. The other four men are caulking the joints
between the iron plates by driving into the joints a mixture of sal
ammoniac and iron borings. This sets as hard as iron and if properly
done makes a perfectly water-tight joint.]
[Illustration: THE REMARKABLE ACCURACY OF ENGINEERING
Usually when crossing, with a tunnel, a wide river or estuary the
tunnel is started from each shore and the shields are pushed through
the ground until they meet somewhere about the middle of the river.
This shows two of the Pennsylvania tunnel shields which have met far
below the Hudson River. The white arrow shows where each shield ends.
The platform of one shield on which the man stands corresponds exactly
with the platform of the other shield. As may be imagined, it takes
very careful and skillful engineering and surveying work, both before
the work is begun and while it is being carried out, to enable tunnel
shields to meet like this. This part of the art of tunnelling would
take an article to itself.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account