The Catholic World, Vol. 01, April to September, 1865: A Monthly Eclectic MagazineVarious
Religion
The Catholic World, Vol. 01, April to September, 1865: A Monthly Eclectic Magazine
Various
Catholic Church -- Periodicals
The difficulties encountered in the carrying out of these various
geodetic operations can scarcely be exaggerated. It is true that
nothing is more easy than to picket out a straight line on the ground,
or to measure an angle correctly with a theodolite; but if we consider
the aspect of the locality in which these operations had to be
conducted, repeated over and over again, and tested in every available
manner with the most minute accuracy, we shall be quite ready to
accord our share of praise and admiration to the perseverance which
successfully carried out the undertaking. In these regions, the sun,
fogs, snow, and terrific winds succeed each other with truly
marvellous rapidity, the distant points become obscured by clouds,
perhaps at the very moment when an important sight is to be taken,
causing most vexatious delays, and often necessitating a
recommencement of the whole operation. These delays may in some cases
extend for days, and even weeks. To these inconveniences add the
necessity of mounting and descending daily with delicate instruments
from three thousand to four thousand feet over rocks and rugged
mountain-paths, the time occupied in sending from one point to
another, and the difficulty of planting pickets on elevated positions
often almost inaccessible. All these inconveniences considered, and we
must admit the unusual difficulties of a series of operations which,
under other circumstances, would have offered nothing peculiarly
remarkable.
As has already been pointed out, the excavation of the gallery at both
ends had already been in operation, by ordinary means, since the
latter part of the year 1857; this work continued without interruption
until the machinery was ready; and the progress made in that time
affords a valuable standard by which to measure the effect of the new
machinery. In the interval between the end of 1857 and that to which
we have now arrived, namely, the end of 1858, many important works had
been pushed forward. At Bardonnêche, the communications had been
opened, and bridges and roads constructed for facilitating the
transport of the heavy machinery. Houses for the accommodation of the
workmen had been rapidly springing up, together with the vast edifices
for the various magazines and offices. The canal, more than a mile and
a half in length, for conveying water to the air-compressing machines,
was constructed, and the little Alpine village had become the centre
of life and activity. At Fourneaux, works of a similar character had
been put in motion; only here the transport of the water for the
compressors was more costly and difficult, the water being at a low
level. At first, a current derived from the Arc was used to raise
water to the required height, but afterward it was found necessary to
establish powerful forcing-pumps, new in their details, which are
worked by huge water-wheels driven by the Arc itself. Early in the
month of June, 1859, the first erection of the compressing machinery
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account