The amount of water which is added to make the mixture of concrete
should not be too much. It should be of such a quantity that the mix is
mushy but not watery, even when it is to be poured into forms.
_Sidewalks and Porch Floors_
[Illustration: Concrete Sidewalk]
It is generally recognized that one-course concrete sidewalks are the
most successful when built by the average workman, for the slab is
of one uniform body and not two layers, which might not have knitted
together properly. For porch floors and walks these slabs should be
5 inches thick and laid on a good foundation. It is best to excavate
4 inches for the depth of the walk, tamp the ground, and pour water
over it, to note whether it is absorbed or stays on top. If it is not
readily drained off, it ought not to be used as the foundation of the
walk, but should be excavated to a depth of 10 inches to 12 inches.
In this excavation should then be tamped gravel or cinders, and some
provision should be made by which any water that would seep through
this gravel may be drained off. The timbers used for the forms along
the edges of the walk may be 2 by 6’s, held in position with pegs.
Slabs should then be determined for length. Usually they should not be
in excess of 6 feet in any one direction and ¼-inch expansion joints
should be placed in the walks every 25 feet. If alternate slabs are
laid, the forms can be removed, so that the intermediate slabs can
be poured between them. Of course, a partial bond will be developed
between slabs in this way, but these joints will be the weakest point
in the walk, and if settlement takes place unequally and one slab
breaks from the other, the crack will develop at this joint and not
appear on the face. The expansion joints should, however, be real
separations, made with strips of asphaltic felt set between slabs. The
usual mixture for concrete walks should be 1 part cement to 2 parts
sand to 3 parts of gravel. The mixture should not have too much water
in it, and when poured into the forms the top should be levelled off
with a straight stick stretched across from one side of the form to
the other. Too much trowelling should be avoided, since this is apt to
draw excess water to the surface and also cement, which will show hair
cracks when hardened. It is best not to use a metal trowel but a wooden
one, so that a partial sandy surface is made. After the walk has been
laid it should be protected from drying out too quickly by laying over
it 4 inches of earth or two or three layers of burlap, which should
be wet down about twice a day for a week. All walks and porch floors
should have graded tops, so that water will run off of them. This is
usually ¼ inch to the foot.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account