=Aeration.=—After leaving the meter, the water passes to the
sedimentation-basin through eleven outlets. These outlets consist of
12-inch pipes on end, the tops of which are 4 feet above the nominal
flow-line of the sedimentation-basin. Each of these outlet-pipes is
pierced with 296 3/8-inch holes extending from 0.5 to 3.5 feet below
the top of the pipe. These holes are computed so that when 11,000,000
gallons of water per day are pumped all the water will pass through the
holes, the water in the pipes standing flush with the tops. The water
is thus thrown out in 3256 small streams, and becomes aerated. When
more than the above amount is pumped, the excess flows over the tops of
the outlet-pipes in thin sheets, which are broken by the jets.
[Illustration:
GENERAL PLAN
FIG. 2.]
Regarding the necessity for aeration, no observations have been taken
upon the Hudson River, but, judging from experience with the Merrimac
at Lawrence, where the conditions are in many respects similar, the
water is at all times more or less aerated, and, for the greater
part of the year, it is nearly saturated with oxygen, and aeration
is not necessary. During low water in summer, however, there is much
less oxygen in the water, and at these times aeration is a distinct
advantage. Further, the river-water will often have a slight odor, and
aeration will tend to remove it. The outlets are arranged so that they
can be removed readily in winter if they are not found necessary at
that season.
=Sedimentation-basin.=—The sedimentation-basin has an area of 5 acres
and is 9 feet deep. To the overflow it has a capacity of 14,600,000
gallons, and to the flow-line of the filters 8,900,000 gallons.
There is thus a reserve capacity of 5,700,000 gallons between these
limits, and this amount can be drawn upon, without inconvenience, for
maintaining the filters in service while the pumps are shut down. This
allows a freedom in the operation of the pumps which would not exist
with the water supplied direct to the filters.
The water enters the sedimentation-basin from eleven inlets along
one side, and is withdrawn from eleven outlets directly opposite.
The inlets and aerating devices described previously bring the water
into the basin without current and evenly distributed along one
side. Both inlets and outlets are controlled by gates, so that any
irregularities in distribution can be avoided. The concrete floor of
the sedimentation-basin is built with even slopes from the toe of each
embankment to a sump, the heights of these slopes being 1 foot,
whatever their lengths. The sump is connected with a 24-inch pipe
leading to a large manhole in which there is a gate through which water
can be drawn to empty the basin. There is an overflow from the basin
to this manhole which makes it impossible to fill the basin above the
intended level.
[Illustration: LONGITUDINAL SECTION ON _a-b-c-d-e-f-g-h_
FILTER BEDS
PLAN AND SECTION OF FILTER NO. 2
FIG. 3.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account