The movement for both our present water supply and for the
incorporation of the village first took effective shape in the year
1891, when a few public-spirited citizens of the village subscribed
to a fund to be expended in a survey to determine whether the water
of Little Long Pond, now known as "Walton Lake," could be brought to
the village under such pressure as would make it available for fire
protection. The preliminary survey was made under the direction of
Joseph Board and George M. Roe. The facts were convincing that this
was a most favorable project for a water supply. First, the
organization of a private company was proposed, and from this
developed the incorporation of our village, the citizens realizing
that if we were to have a water supply it must be owned by the
village. Accordingly this was done with the happy result that has
made us the envy of our neighboring villages.
[Illustration: Joseph Board]
On October 17, 1892, Mr. Joseph Board was appointed as resident
superintendent in the construction of the water works, and when the
water was turned on, in exactly a year, October 17, 1893, the
inhabitants of our village had the satisfaction of knowing that each
length of pipe so laid had been under the inspection of our
superintendent.
The village of Chester was incorporated June 23, 1892. having a
population of 1,400; 125 voters favored the incorporation and only
the small number of thirteen opposed the proposition. At the first
caucus, held July 12, 1892, were nominated W. A. Lawrence as
president; Joseph Durland, George M. Roe and Thad. S. Durland,
trustees. At the first election, held July 20, 1892, the above
citizens were elected to their respective offices. The village board
was organized on the same date, naming Joseph Board as village clerk.
The board of water commissioners was organized August 15, 1892, with
Messrs. W. A. Lawrence, Joseph Durland, George M. Roe and T. S.
Durland as commissioners, and Joseph Board, clerk. A taxpayers'
meeting was called September 2, 1892, to vote on the question of
assessment for water-works, with the following results: Sixty-eight
in favor, against seven. Contract was executed at a total cost of
$53,000 at their final completion.
This water supply for the village of Chester is one of the best in
the State. The source is Walton Lake, formerly known as Little Long
Pond, a beautiful sheet of spring water, covering an area of 127
acres, with a storage capacity of 3-1/2 feet, each foot of water
giving a supply of over 40,000,000 gallons. This supply is a gravity
system. From this lake, at an elevation of 250 feet above the level
of Main street, at Chester Station, giving a working pressure of 80
to 90 pounds, there was laid for water-mains, 8,197 feet of 12-in.
pipe, 6,978 feet of 19-in. pipe, 14,820 feet of 8-in. pipe, 5,748
feet of 6-in. pipe, 6,312 feet of 4-in. pipe.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account