"That's what I'm here for. If you finish your bridge and it stands the
spring break-up, we'll be satisfied. I shall expect to stay here and
watch the work."
O'Neil agreed heartily. "You're very welcome, Mr. Blaine. I like your
brand of conversation. I build railroads; I don't run them. Now let's
get down to figures."
The closing of the option required several weeks, of course, but the
outcome was that even before mid-winter arrived O'Neil found himself in
the position he had longed to occupy. In effect the sale was made, and
on terms which netted him and his backers one hundred per cent. profit.
There was but one proviso--namely, that the bridge should be built by
spring. The Heidlemanns were impatient, their investment up to date had
been heavy, and they frankly declared that failure to bridge the chasm
on time would convince them that the task was hopeless. In a way this
was unreasonable, but O'Neil was well aware that they could not permit
delay--or a third failure: unless his route was proved feasible without
loss of time they would abandon it for one they knew to be certain,
even though more expensive. He did not argue that the task was of
unprecedented difficulty, for he had made his promise and was ready to
stand or fall by it. It is doubtful, however, if any other contractor
would have undertaken the work on such time; in fact, had it been a
public bridge it would have required four years in the building. Yet
O'Neil cheerfully staked his fortune on completing it in eight months.
With his option signed and the task squarely confronting him, he
realized with fresh force its bigness and the weight of responsibility
that rested upon his shoulders. He began the most dramatic struggle of
his career, a fight against untried conditions, a desperate race
against the seasons, with ruin as the penalty of defeat.
The channel of the Salmon at this point is fifteen hundred feet wide
and thirty feet deep. Through it boils a ten-mile current; in other
words, the waters race by with the speed of a running man. Over this
O'Neil expected to suspend a structure capable of withstanding the
mightiest strains to which any bridge had ever been subjected. Parker's
plans called for seventeen thousand yards of cement work and nine
million pounds of steel, every part of which must be fabricated to a
careful pattern. It was a man-sized job, and O'Neil was thankful that
he had prepared so systematically for the work; that he had gathered
his materials with such extraordinary care. Supplies were arriving now
in car-loads, in train-loads, in ship-loads: from Seattle, from
Vancouver, from far Pittsburg they came in a thin continuous stream,
any interruption of which meant confusion and serious loss of time. The
movement of this vast tonnage required the ceaseless attention of a
corps of skilled men.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account