On April 5th the last of the steel for Span Number One reached the
front, and erection was begun. The men fell to with a vim and an
enthusiasm impossible to describe. With incredible rapidity the heavy
sections were laid in place; the riveters began their metallic song;
the towering three bent traveler ran smoothly on its track, and under
it grew a web work of metal, braced and reinforced to withstand, in
addition to ordinary strains, the pressure of a hundred-mile-an-hour
wind. To those who looked on, the structure appeared to build itself,
like some dream edifice; it seemed a miracle that human hands could
work that stubborn metal so swiftly and with so little effort. But
every piece had been cut and fitted carefully, then checked and placed
where it was accessible.
Now that winter had broken, spring came with a rush. The snows began to
shrink and the drifts to settle. The air grew balmier with every day;
the drip from eaves was answered by the gurgling laughter of hidden
waters. Here and there the boldest mountainsides began to show, and the
tops of alder thickets thrust themselves into sight. Where wood or
metal caught the sun-rays the snow retreated; pools of ice-water began
to form at noon.
The days were long, too, and no frozen winds charged out of the north.
As the daylight lengthened, so did the working-hours of the toilers.
On April 18th the span was completed. In thirteen days Mellen's crew
had laid four hundred feet of the heaviest steel ever used in a bridge
of this type. But there was no halt; the material for the second
section had been assembled, meanwhile, and the traveler began to swing
it into place.
The din was unceasing; the clash of riveters, the creak and rattle of
hoists, the shouts of men mingled in a persistent, ear-splitting
clamor; and foot by foot the girders reached out toward the second
monolith which rose from the river-bed. The well-adjusted human machine
was running smoothly; every man knew his place and the duties that went
with it; the hands of each worker were capable and skilled. But now the
hillsides were growing bare, rills gashed the sloping snow-fields, the
upper gullies began to rumble to avalanches--forerunners of the process
that would strip the earth of snow and ice and free the river in all
its fury. In six days three hundred feet more of steel had been bolted
fast to the complete section, and Span Two was in place. But the
surface of the Salmon was no longer white and pure; it was dirty and
discolored now, for the debris which had collected during the past
winter was exposing itself. The icy covering was partially inundated
also; shallow ponds formed upon it and were rippled by the south
breeze. Running waters on every side sang a menace to the workers.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account