It was hard digging, but the youngsters stuck to the work and finished
within a week. Earth to the depth of three feet was removed, and by
piling this around the entire margin of the excavation the level was
raised about one and one half feet for a distance of eight feet on all
sides. This plan avoided the necessity of hauling away the earth, gave
the desired depth, and provided a flat surface eight feet wide all
around the pool.
The rough digging being finished, the sides of the excavation were
trimmed with a spade to an angle of about forty-five degrees. Rough two
by four-inch studding was then cut into lengths of four and one half
feet and placed four feet apart all around the banks. Where each piece
of studding was set, the earth was removed, so that the timber was made
flush with the soil. The end of each piece of timber was also sunk in
the earth at the bottom of the pit for about three inches, in order
that it might be held firmly against the bank. Rough pine boards, free
from cracks and knot holes, were then nailed to the timbers at the top
only. These boards were twelve inches wide, and thus formed a border
or rim all around the upper portion of the pit, one foot in width. At
right angles to the twelve-inch rough boards others of the same size
were nailed, the last projecting out on the level ground, thus forming
a boardwalk around the excavation. The main object of these boards was
to keep the waves from washing the banks and to give a clean place upon
which to stand or sit while not actually in the water.
The boards being up, there was still left about three feet of the
sides, and the entire bottom of the excavation, without covering of
any kind. It was decided to cover the sides and bottom with cement,
plastering this material directly upon the earth. The cement was mixed
with sand, one part cement and two parts of sand, and was spread on
with a mason's trowel. Two and a half barrels of cement and about four
barrels of sand were used. Toward the last, pure cement was applied as
a thin wash to the entire surface.
The cementing was a pretty tough job, but with the help of an old
coloured man the work was finally done in a thorough manner, and the
pit was then as tight as a jug. It was allowed to dry for two days;
then the water was turned in. The water was supplied from the service
pipe of our home near by, and as it is furnished by meter, we had no
qualms as to the quantity used. The pool holds about eight thousand
gallons and requires from twelve to fifteen hours to fill it through a
three-quarter inch pipe.
The entire cost of the work, not counting the boys' time, was as
follows:
12 boards, 1 × 12 × 16 $2.25
8 pieces rough pine, 2 × 4 × 16 1.05
2½ barrels cement at $1.50 per barrel 3.75
------
Total $7.05
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account