Although the works of the Liverpool and Manchester Railway are of
a much less formidable character than those of many lines that have
since been constructed, they were then regarded as of a stupendous
kind. Indeed, few works of such magnitude had before been executed in
England. It had been the engineer's original intention to carry the
railway from the north end of Liverpool round the red sandstone ridge
on which the upper part of the town is built, and also round the higher
rise of the coal formation at Rainhill, by following the natural levels
to the north of Knowsley. But the opposition of the land-owners having
forced the line more to the south, it was rendered necessary to cut
through the hills, and go over the high grounds instead of round them.
The first consequence of this alteration in the plans was the necessity
for constructing a tunnel under the town of Liverpool a mile and a
half in length, from the docks at Wapping to the top of Edgehill; the
second was the necessity for forming a long and deep cutting through
the red sandstone rock at Olive Mount; and the third and worst of all
was the necessity for ascending and descending the Whiston and Sutton
hills by means of inclined planes of 1 in 96. The line was also, by
the same forced deviation, prevented passing through the Lancashire
coal-field, and the engineer was compelled to carry the works across
the Sankey valley at a point where the waters of the brook had dug out
an excessively deep channel through the marl-beds of the district.
The principal difficulty was experienced in pushing on the works
connected with the formation of the tunnel under Liverpool, 2200
yards in length. The blasting and hewing of the rock were vigorously
carried on night and day; and the engineer's practical experience in
the collieries here proved of great use to him. Many obstacles had to
be encountered and overcome in the formation of the tunnel, the rock
varying in hardness and texture at different parts. In some places
the miners were deluged by water, which surged from the soft blue
shale found at the lowest level of the tunnel. In other places beds
of wet sand were cut through, and there careful propping and pinning
were necessary to prevent the roof from tumbling in until the masonry
to support it could be erected. On one occasion, while Stephenson
was absent from Liverpool, a mass of loose moss-earth and sand fell
from the roof, which had been insufficiently propped. The miners
withdrew from the work; and on the engineer's return he found them in
a refractory state, refusing to re-enter the tunnel. He induced them,
however, by his example, to return to their labors; and when the roof
had been secured, the work went on again as before. When there was
danger, he was always ready to share it with the men; and, gathering
confidence from his fearlessness, they proceeded vigorously with the
undertaking, boring and mining their way toward the light.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account