This class of bridge, by the avoidance of abutments and counterforts,
simplifies the construction of skew arches, while on sharp curves it
presents but little obstruction to the view along the line.
A curious use of arches of this construction, as applied by Mr. Brunel,
may be seen on the South Wales Railway near Llansamlet, between Neath
and Swansea. A deep cutting through the coal measures showed a tendency
to slip, and a large amount of excavation would have been required to
flatten the slope, as a hill rose immediately above the side of the
cutting. Four of these flying arches were thrown across the cutting at
short intervals, and weighted with heavy copper slag, so that the sides
of the cutting are kept apart by the thrust of the loaded arches.
Among the skew bridges on Mr. Brunel’s railways, there are a few of
extreme obliquity. Of these may be mentioned two large road bridges near
Berkeley, over the Bristol and Gloucester Railway, one being 48° and the
other 53° off the square. Both the bridges are of brickwork, and in the
arch of the first one, which was set in Roman cement, hoop iron was
introduced in the manner successfully employed by Sir Isambard Brunel.
On the South Devon Railway, near Plympton, there is a skew bridge 63°
off the square.
On the Great Western Railway, in the neighbourhood of Bath and Bristol,
there are skew bridges of ashlar masonry built on the mechanically
correct principle of spiral tapering courses, the bed-joints in every
part of the arch being made at right angles to the lines of pressure. By
this method the arch does not depend for its stability on the friction
and cohesion of the materials, as it does to a great extent in very skew
bridges, built in the usual way with spiral parallel courses, especially
when the arches are semi-circular or semi-elliptical.
* * * * *
Mr. Brunel’s bridges of masonry and brickwork were well known for the
comparatively small quantity of material used in them; and, though it
was requisite that the materials and workmanship should be of superior
quality, their cost was comparatively small.
The specifications he prepared for all his works, and on which the
contracts were based, were noted for the completeness with which they
were drawn up, and for their not requiring a standard of perfection
higher than that which was actually to be carried out. The confidence
with which Mr. Brunel was regarded enabled him to insist with effect on
the work being executed according to his interpretation of the
contract.
In connection with the design of engineering works, and especially of
brickwork and masonry bridges, the following letter from Mr. Brunel to
one of his assistants, who was abroad, will be found interesting:--
December 30, 1854.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account