The same amount of capital and the same expenditure in money for
fuel now required for a line of ships of the present dimensions
would build and work ships to carry in the year double the number
of passengers, with far superior accommodation, and in about half
the time, and two or three times the amount of cargo; the whole
difference being produced simply by making the vessel _large enough
to carry its own coal_, exactly as when the ‘Great Western’ was
projected for the New York line, the passage had been considered an
impossible one for steamboats, or, if possible, only at a total
sacrifice of all return for the cost. Certainly, no steamboat then
built could get across except by a chance fair weather passage, and
then only by being completely filled with coals and leaving no room
for passengers or cargo. Simply by building a ship of the size
necessary to take the coal, over and above the accommodation
required for a due number of passengers and a reasonable quantity
of cargo, the passage was rendered perfectly easy and certain, and
has since become a mere matter of course, and an ordinary and
profitable trading voyage.
The increased size, instead of being a disadvantage, was found, as
predicted by the projectors, to be a great benefit, and gave
increased speed, even beyond that proportionate to the power; and
this steamboat, built in 1836, is still as good as any of her size
afloat.
Nothing more novel is proposed now, but again to build a vessel _of
the size required to carry her own coals for the voyage_. The use
of iron, which has since 1836 become common, removes all difficulty
in the construction, and the experience of several years has
proved, what was believed before by most unprejudiced persons, that
size in a ship is an element of speed, and of strength, and of
safety, and of great relative economy, instead of a disadvantage;
and that it is limited only by the extent of demand for freight,
and by the circumstances of the ports to be frequented.
A Committee was appointed to confer with Mr. Brunel and with Mr. Scott
Russell, ‘who was fully acquainted with all Mr. Brunel’s plans, and had
ably assisted him in maturing them.’[141]
The Committee reported to the Directors that they had met on the day
after their appointment, when, Mr. Brunel being unavoidably absent, Mr.
Russell had attended and entered into a very full explanation of Mr.
Brunel’s plans, and that a long investigation of his proposition had
taken place; that a few days later they had met again, when Mr. Brunel
attended, and that after a further and most satisfactory investigation,
they had come to an unanimous decision in favour of the scheme. This
resolution was adopted, and Mr. Brunel was appointed Engineer to the
Company.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account