This same vessel, fitted up for the Australian voyage, and loaded
deeper, would carry coals to Australia and back, would take out
3,000 passengers easily, and a small amount of cargo only, but
could bring back any amount that could be conveniently collected,
or if provision were made for taking in 3,000 or 4,000 tons of coal
in Australia, that additional amount of cargo might be taken in the
passage out. The passage out to Port Philip should be made easily
in 36 days, and home by Cape Horn in the same time.
The Committee having come to the conclusion that this class of
vessel would best fulfil the several conditions which the
circumstances imposed, I have been engaged in determining the
several details consequent upon this selection of size, and have
put in hand drawings of the ship, which will enable me to arrive
more correctly at the cost, and will enable us to obtain tenders
for the construction. These details involve a great deal of study
and consideration, and the making of the drawings alone requires
some considerable time, so that I do not think much advance can be
made under three weeks from the present date, but I will endeavour
to expedite the work as much as possible.
Mr. Brunel was authorized to continue his communications with
engine-makers and ship-builders, and to invite tenders.
After very detailed and careful calculations of the smallest capacity
that would secure the attainment of the objects sought for, the
dimensions of the vessel and the power of the engines were finally
determined; tenders were received from Mr. Scott Russell, Messrs. Watt
and Co., and Messrs. Humphrys and Co. for both sets of engines, and from
Mr. Russell for the construction of the hull of the ship and for placing
her afloat.
A meeting of the Directors was held on May 18, when Mr. Brunel submitted
the various tenders he had received. The Board agreed to adopt his
recommendations, and to accept the tenders of Mr. Scott Russell for the
ship and paddle engines, and that of Messrs. James Watt and Co. for the
screw engines.
The following report, which Mr. Brunel placed before the Directors,
gives a detailed account of the steps he had taken to procure the
tenders, and the grounds on which he had formed his judgment of them:--
_Report on Tenders._[144]
May 18, 1853.
According to your instructions, I applied to the several parties
with whom I had previously been in communication on the subject of
the engines and ship, for tenders for their supply. As regards the
engines, I drew up a short specification, defining generally what
was required, and leaving the parties to make their own designs and
propose to me the form of engine they would adopt.
With respect to the ship, where no such variation could be
permitted, I have had very detailed drawings and specifications
prepared.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account