Subscriptions came in but slowly, and it was not till 1836 that the
works were commenced.
The first stone of the abutment on the Leigh woods or Somersetshire side
of the river was laid on August 27 by the Marquis of Northampton,
President of the British Association, which was then holding its meeting
in Bristol.[30]
The span of the bridge is greater than that of Mr. Brunel’s design for
the second competition, but much less than the spans of the earlier
designs, to which he had given the preference.[31] On this point, as
well as on the question of site, he had to conform to the wishes of the
trustees.[32] The span approved of by them necessitated the building of
a very large abutment on the Leigh woods side, the height of which, from
the surface of the rock to the level of the roadway, is 110 feet. Above
the roadway, the tower to carry the chains is built to a height of 86
feet. On the Clifton side, the base of the tower is formed by one of the
boldest of the range of St. Vincent’s rocks, which here rise almost
perpendicularly to a height of 230 feet above high water, and
consequently a very small abutment was required. The tower on this side
is 3 feet higher than that on the Leigh woods side, and the roadway has
a general inclination of about 1 in 233. Mr. Brunel thought that if the
roadway were level, it would have the appearance of falling towards
Clifton, owing to the ground there being precipitous, while on the
Leigh woods side it is sloping.
He intended, in the construction of the bridge, to have followed out the
ideas embodied in his report of 1829, and would have preferred to have
had only one chain on each side of the bridge, and that much stronger
than was usually adopted; but, in deference to public opinion, he put
two chains, though he doubted if they would expand equally. ‘A rigid
platform would in some degree prevent the unequal distribution of load
thus caused, but he endeavoured to lessen the effect of unequal
expansion by arranging a stirrup at the top of each suspending rod, so
as to hold equally at all times on both chains, and thus to cause each
to sustain its proportion of the load.’
The road platform was to have had beneath it ‘a complete system of
triangular bracing, which would render it very stiff.’
In order to lessen the action of wind on the bridge, he brought down the
main chains in the centre nearly to the level of the platform, and
intended to apply the system of brace chains at a small angle to check
vibration. There were, moreover, to be two curved chains lying
horizontally, and attached underneath the platform, so as to resist the
lateral action of the wind.[33]
He here introduced movable saddles to carry the chains on the top of the
towers, with rollers running on perfectly flat and horizontal roller
beds.[34] By this arrangement no pressure except a vertical one could
come on the towers.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account