In forming all my plans I have looked to the perfection of the
surface on which the carriages are to run, as the great and
ultimate desideratum; and in the detail of construction of this
last operation, without which all the previous labour is
comparatively wasted, I have always contemplated introducing all
the perfection of materials and workmanship of which it is capable.
With a view to improvement on this point, Mr. Brunel considered it would
be advantageous if two important changes were made. He proposed, in the
first place, to abolish the use of stone blocks for the rails to rest
on, and to substitute timber; and, secondly, to apply the support
uniformly and continuously along the whole length of the rails, instead
of only at intervals.
The first of these changes, namely, the substitution of timber for
stone, was not wholly new, for transverse wood sleepers were often used
in exceptional situations; but it was the general opinion that stone,
where it could be applied, formed the best support for the rails,[51]
and the exclusive employment of timber was considered a great
innovation.
The other principle, that of ‘continuous bearing,’ was similar to that
of the old wooden and stone tramways; and, even as applied to iron rails
it had been extensively used before, as Mr. Brunel mentions in his
report of August 1838 (see Appendix I. p. 535.)
Mr. Brunel designed for this continuous bearing a peculiar shape of
rail, which, from the form of its section, acquired the name of the
‘bridge rail.’ The rail was bolted down to the longitudinal timbers, and
the timbers of the two rails were connected together at intervals by
cross-pieces, called transoms, bolted to them; these served to keep the
two rails at a proper distance apart. The longitudinal timbers lay on
gravel or other ‘ballast,’ which had been found to form the best
foundation, as being firm and solid, easy of adjustment, and allowing
free drainage.[52]
Mr. Brunel, however, thought there would be difficulty in giving the
longitudinal baulks a sufficiently solid bearing on the gravel below
them.
A similar difficulty had already been experienced with the heavy stone
blocks used on other railways. As a remedy for this, Mr. Stephenson
caused each block to be lifted and dropped several times on its place,
so as to consolidate the ballast below.
The same thing could not be done with a long wooden baulk, and Mr.
Brunel therefore contrived another mode of overcoming the difficulty.
Piles were driven into the ground between the rails, and their heads
bolted to the cross-transoms, the object being to hold the timber
framework firmly down. The gravel was then rammed hard under the
longitudinal baulks, to give the consolidation desired. The result,
however, of this mode of construction was far from successful, and the
state of the road, when run over by the trains, was in many places very
defective.[53]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account