The Life of Thomas Telford, Civil Engineer: With an Introductory History of Roads and Travelling in Great BritainSmiles, Samuel
History
The Life of Thomas Telford, Civil Engineer: With an Introductory History of Roads and Travelling in Great Britain
Smiles, Samuel
Civil engineers -- Great Britain -- Biography; Roads -- Great Britain; Telford, Thomas, 1757-1834
Attention was especially turned to the improvement of the longer
routes, and to perfecting the connection of London with the chief
town's of Scotland and Ireland. Telford was early called upon to
advise as to the repairs of the road between Carlisle and Glasgow,
which had been allowed to fall into a wretched state; as well as
the formation of a new line from Carlisle, across the counties of
Dumfries, Kirkcudbright, and Wigton, to Port Patrick, for the
purpose of ensuring a more rapid communication with Belfast and the
northern parts of Ireland. Although Glasgow had become a place of
considerable wealth and importance, the roads to it, north of
Carlisle, continued in a very unsatisfactory state. It was only in
July, 1788, that the first mail-coach from London had driven into
Glasgow by that route, when it was welcomed by a procession of the
citizens on horseback, who went out several miles to meet it.
But the road had been shockingly made, and before long had become
almost impassable. Robert Owen states that, in 1795, it took him
two days and three nights' incessant travelling to get from
Manchester to Glasgow, and he mentions that the coach had to cross
a well-known dangerous mountain at midnight, called Erickstane
Brae, which was then always passed with fear and trembling.*[1]
As late as the year 1814 we find a Parliamentary Committee
declaring the road between Carlisle and Glasgow to be in so ruinous
a state as often seriously to delay the mail and endanger the lives
of travellers. The bridge over Evan Water was so much decayed, that
one day the coach and horses fell through it into the river, when
"one passenger was killed, the coachman survived only a few days,
and several other persons were dreadfully maimed; two of the horses
being also killed."*[2] The remaining part of the bridge continued
for some time unrepaired, just space enough being left for a single
carriage to pass. The road trustees seemed to be helpless, and did
nothing; a local subscription was tried and failed, the district
passed through being very poor; but as the road was absolutely
required for more than merely local purposes, it was eventually
determined to undertake its reconstruction as a work of national
importance, and 50,000L. was granted by Parliament with this
object, under the provisions of the Act passed in 1816. The works
were placed under Mr. Telford's charge; and an admirable road was
very shortly under construction between Carlisle and Glasgow.
That part of it between Hamilton and Glasgow, eleven miles in length,
was however left in the hands of local trustees, as was the
diversion of thirteen miles at the boundary of the counties of
Lanark and Dumfries, for which a previous Act had been obtained.
The length of new line constructed by Mr. Telford was sixty-nine
miles, and it was probably the finest piece of road which up to
that time had been made.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account