The Life of Thomas Telford, Civil Engineer: With an Introductory History of Roads and Travelling in Great BritainSmiles, Samuel
History
The Life of Thomas Telford, Civil Engineer: With an Introductory History of Roads and Travelling in Great Britain
Smiles, Samuel
Civil engineers -- Great Britain -- Biography; Roads -- Great Britain; Telford, Thomas, 1757-1834
Although a complete survey was made in 1811, nothing was done for
several years. The mail-coaches continued to be overturned, and
stage-coaches, in the tourist season, to break down as before.*[5]
The Irish mail-coach took forty one hours to reach Holyhead from
the time of its setting out from St. Martin's-le-Grand; the journey
was performed at the rate of only 6 3/4 miles an hour, the mail
arriving in Dublin on the third day. The Irish members made many
complaints of the delay and dangers to which they were exposed in
travelling up to town. But, although there was much discussion, no
money was voted until the year 1815, when Sir Henry Parnell
vigorously took the question in hand and successfully carried it
through. A Board of Parliamentary Commissioners was appointed, of
which he was chairman, and, under their direction, the new
Shrewsbury and Holyhead road was at length commenced and carried to
completion, the works extending over a period of about fifteen years.
The same Commissioners excrcised an authority over the roads
between London and Shrewsbury; and numerous improvements were also
made in the main line at various points, with the object of
facilitating communication between London and Liverpool as well as
between London and Dublin.
The rugged nature of the country through which the new road passed,
along the slopes of rocky precipices and across inlets of the sea,
rendered it necessary to build many bridges, to form many
embankments, and cut away long stretches of rock, in order to
secure an easy and commodious route. The line of the valley of the
Dee, to the west of Llangollen, was selected, the road proceeding
along the scarped sides of the mountains, crossing from point to
point by lofty embankments where necessary; and, taking into
account the character of the country, it must be acknowledged that
a wonderfully level road was secured. While the gradients on the
old road had in some cases been as steep as 1 in 6 1/2, passing
along the edge of unprotected precipices, the new one was so laid
out as to be no more than 1 in 20 at any part, while it was wide
and well protected along its whole extent. Mr. Telford pursued the
same system that he had adopted in the formation of the Carlisle
and Glasgow road, as regards metalling, cross-draining, and
fence-walling; for the latter purpose using schistus, or slate
rubble-work, instead of sandstone. The largest bridges were of
iron; that at Bettws-y-Coed, over the Conway--called the Waterloo
Bridge, constructed in 1815--being a very fine specimen of
Telford's iron bridge-work.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account