skill, and dangerously involved the reputation of the directors as
well as of their engineer."
Among the remaining bridges executed by Mr. Telford, towards the
close of his professional career, may be mentioned those of
Tewkesbury and Gloucester. The former town is situated on the
Severn at its confluence with the river Avon, about eleven miles
above Gloucester. The surrounding district was rich and populous;
but being intersected by a large river, without a bridge, the
inhabitants applied to Parliament for powers to provide so
necessary a convenience. The design first proposed by a local
architect was a bridge of three arches; but Mr. Telford, when
called upon to advise the trustees, recommended that, in order to
interrupt the navigation as little as possible, the river should be
spanned by a single arch; and he submitted a design of such a
character, which was approved and subsequently erected. It was
finished and opened in April, 1826.
This is one of the largest as well as most graceful of Mr. Telford's
numerous cast iron bridges. It has a single span of 170 feet, with
a rise of only 17 feet, consisting of six ribs of about three feet
three inches deep, the spandrels being filled in with light
diagonal work. The narrow Gothic arches in the masonry of the
abutments give the bridge a very light and graceful appearance,
at the same time that they afford an enlarged passage for the high
river floods.
The bridge at Gloucester consists of one large stone arch of 150
feet span. It replaced a structure of great antiquity, of eight
arches, which had stood for about 600 years. The roadway over it
was very narrow, and the number of piers in the river and the small
dimensions of the arches offered considerable obstruction to the
navigation. To give the largest amount of waterway, and at the same
time reduce the gradient of the road over the bridge to the
greatest extent, Mr. Telford adopted the following expedient.
He made the general body of the arch an ellipse, 150 feet on the
chord-line and 35 feet rise, while the voussoirs, or external
archstones, being in the form of a segment, have the same chord,
with only 13 feet rise. "This complex form," says Mr. Telford,
"converts each side of the vault of the arch into the shape of the
entrance of a pipe, to suit the contracted passage of a fluid, thus
lessening the flat surface opposed to the current of the river
whenever the tide or upland flood rises above the springing of the
middle of the ellipse, that being at four feet above low water;
whereas the flood of 1770 rose twenty feet above low water of an
ordinary spring-tide, which, when there is no upland flood, rises
only eight or nine feet."*[1] The bridge was finished and opened in
1828.
[Image] Dean Bridge, Edinburgh.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account