The Men of the Merchant Service: Being the polity of the mercantile marine for 'longshore readersBullen, Frank Thomas
History
The Men of the Merchant Service: Being the polity of the mercantile marine for 'longshore readers
Bullen, Frank Thomas
Merchant marine; Merchant mariners; Sailors
But permanent work, by far the most important, and demanding the
greatest amount of seamanship, includes all the care of the standing
rigging, the sending up or down of masts and yards, and the thousand
and one repairs that are necessary in order that the mazy fabric of a
sailing ship's top-hamper may do its work of propulsion in association
with the wind. Of all the heavier work of this kind, _i.e._ shifting
the yards and masts, that of handling the royal and sky-sail yards is
the most frequently indulged in; for many skippers commanding old ships
dare not put too much strain upon the lighter masts in heavy weather,
and they therefore make a rule of sending down the loftiest yards when
they bend their heavy-weather sails. Now, a royal yard _in situ_ is
a spar of, say, thirty-five feet in length (varying, of course, with
the size of the ship), seven or eight inches in diameter in the slings
(the centre), and tapering at both ends, or yard-arms, to four inches,
or even less. By means of three (sometimes only one) encircling iron
sling-bands in its centre, it is attached to an iron, leather-lined
collar, which goes round the royal mast, and is called the "parral."
It is also suspended by a chain "tye," which leads through a
sheave-hole at the masthead, and is connected on the after-side to a
purchase for hoisting the yard, the whole tackle constituting the royal
"haulyards," "halliards," or "halyards," the latter for choice.
From each yard-arm to the masthead run pieces of rope, which are tight
when the yard is lowered. They are called "lifts," and are for the
purpose of keeping the yard horizontal, and of sustaining the extra
weight put upon it by men who go upon it for any purpose. Looped abaft
the yard are the "foot-ropes," upon which the men stand when furling
or bending the sail, and attached to each yard-arm are the "braces"
for the purpose of slinging the yard from one side to the other. All
this gear is for the yard alone. Then there is the sail, with a rope
running through a block under both quarters of the yard, and down
to the corners of the sail abaft all, the "clew-lines," while from
a block at the masthead another rope runs down through a block or
bull's-eye seized on to the tye close down to the yard, and so, being
forked before-all to the foot of the sail, where it is seized, one leg
on either side to the foot. This is the "bunt-line." The clew-lines,
bunt-lines, halyards, and braces are worked from the deck, and
constitute the "running-gear" of the sail.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account