The Men on Deck: Master, Mates and Crew, Their Duties and ResponsibilitiesRiesenberg, Felix
History
The Men on Deck: Master, Mates and Crew, Their Duties and Responsibilities
Riesenberg, Felix
Merchant marine -- United States; Navigation; Sailors
+Coal Cargo.+ The Chief Mate should see that stowage is not commenced
until the hold has been properly prepared. See that steel masts are
carefully sealed, at the heel, that there is no "up take" for gases, in
the event of fire. See that every possible point of "up take" is stopped
off. See that shifting boards are firmly secured. That pillars and
stanchions are secure, if they have been replaced, and that the hold, if
length of passage warrants, is fitted with a gas pipe, plugged at bottom
end, for lowering a thermometer into the body of the cargo. Temperatures
should be taken at least every watch.
+Ventilation.+ Ventilation, +on the surface of the coal+, is very
necessary. Two ventilators, at least, for each hold; an intake and an
uptake (uptake to windward).
+Wet Coal.+ Wet coal is dangerous—it is specially subject to spontaneous
combustion.
+Trimming.+ In loading coal cargo, where nothing else is taken, the trim
of the vessel should be carefully watched by the Chief Mate, and the
trimmers directed in their work so that no subsequent trimming is
required after the cargo is all on board. Many kinds of coal sift down
and flow easily—this should be kept in mind.
+Ore Cargo.+ Vessels carrying ore are usually designed for that
particular trade. Where ore is to be carried in the usual type of
freighter, special care must be taken to fit the required trunks and
shifting boards. Heavy ore carried in the lower holds is liable to make
a vessel crank, and the Chief Mate should see that means are provided
for the lifting up of the weights, and the proper distribution, fore and
aft. The usual plan, in a vessel with four holds, is to fill No. 2 and
No. 3, and trim with No. 1 and No. 4. This keeps the cargo high
amidships, and eases the vessel in a seaway.
+Wooden Steamers.+ The shipment of ore cargoes in vessels of weak
construction, should not be attempted unless the movement of the ore
cannot be accomplished in any other way. The wooden steamers, built as
an emergency measure, are a case in point.
The highest skill in loading, stowage and handling will be required for
these vessels.
+Grain Cargo.+ The carriage of grain cargo calls for special precautions
to prevent shifting. The British Board of Trade and the underwriters
have made special rules for the stowage of such cargoes. The Chief Mate
should inform himself of these rules as a part of his stock of knowledge.
+Cotton Cargo.+ The danger to fire when loading a cotton cargo is great
and every precaution should be taken. Smoking, which should never be
permitted in the holds or about the hatches at any time, should be
specially guarded against when loading cotton.
Care should be taken that no sparks from the funnels, from passing or
nearby tugboats, or from steam boilers on the wharf, find their way into
the hatches. Have the fire lines connected up at all times and have the
steam on the smothering lines.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account