On the east end of the line, where Erie's engineers built their greatest
low-grade cut-off, the coal rolls down to the seaboard in such quantities
as to make the west-bound tonnage only a quarter of the east-bound; so the
reconstruction engineers were satisfied with a maximum west-bound grade at
6-10 of one per cent as against the maximum of 2-10 east-bound, in the
direction of the heavy traffic. The cut-off, which is double-tracked and
is 42-1/2 miles long, increases the distance from New York to Chicago 8
miles; but this is not an essential fact, for, like the Genesee Valley
Road it is built exclusively for freight service, and not only almost
triples the hauling capacity of a locomotive but actually permits of
faster running time for the freight trains between Jersey City and Port
Jervis. To build the cut-off required a really great expenditure, for like
all these new lines it was "heavy work," embracing a tunnel nearly a mile
long under the crest of the Shawangunk Ridge, and a steel trestle over the
Moodna Valley, 3,200 feet in length and 190 feet high. Still President
Underwood can contemplate his locomotives hauling three times their old
loads over it. The economy of such a proposition becomes apparent upon the
face of it.
The Baltimore & Ohio, the Southern, and the Norfolk & Western have
recently lowered their grades and straightened their curves in similar
fashion; the Lehigh Valley, by the erection of a great new bridge at
Towanda, Pa., has taken a bad link out of its main line; the Chicago &
Alton, when the engineers told it that it must abandon miles upon miles of
its main line (for long years its pride) and build anew, told those
engineers to go ahead. Stretch by stretch the old road was revamped to
meet in every way modern conditions. A steel bridge across the Missouri,
which was the first steel bridge built in America, and which cost
$500,000, was sent to the scrap-heap while the old-timers groaned. "That
which yesterday was a railroad marvel becomes a curiosity to-morrow,"
observes Frank H. Spearman, in speaking of this very thing.
The rebuilding of the Chicago & Alton was a clean-cut affair. The 70-pound
rails were torn from the main line and sent to sidings and branch lines in
favor of the 80-pound rails; for while men were tearing at the tracks, the
shops were working overtime; 55-ton freight engines that could haul 30
cars were to give way to 165-ton motive power, capable of picking up and
carrying a hundred cars with ease. That was why the old bridge had to go
in favor of one which cost an even million dollars. And when the Alton
built heavy new bridges at dozens of other points besides the Missouri, it
built them after the new fashion, with solid rock ballast floor, affording
additional comfort and safety to its patrons.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive