Every large city has become, in a sense, a bottle-neck for the important
railroads that pierce it. In some cases like Chicago or St. Louis or
Kansas City or Indianapolis, the situation has been solved by the creation
of belt-line freight railroads partly or entirely encircling the town. At
Buffalo, the New York Central lines have built a connecting line to enable
through traffic to escape the congestion of city yards and terminals,
while at New Haven, the road of the same name has recently spent several
million dollars in enlarging its narrow throat in the middle of the town.
But nowhere else did the situation approach that at Pittsburgh. Through
the Pennsylvania's passenger station there poured not only an abnormally
heavy passenger traffic, owing to a heavy suburban service, but every
pound of freight bound between the parent company and its two great
subsidiaries, the Panhandle and the Fort Wayne. There were further
complications right at the station, owing to the proximity of two of the
very worst grade-crossings in America, where Penn and Liberty Avenues
swept their busy tides of city traffic all day long over the Fort Wayne's
main line tracks. It was a problem that called for the best in engineering
skill--and received it.
The Pennsylvania dug deep into its pocket-book and solved the problem
magnificently. It began by going back to the vicinity of its great
Pitcairn freight-yards at the east of the city, and from them building two
connecting laterals (the one to the south and across the Monongahela River
to connect with the Panhandle tracks, the other to the north--known as the
Brilliant cut-off) across the Alleghany and connecting with the tracks of
the West Penn Railroad, which in turn connected with those of the Fort
Wayne in the one-time city of Allegheny. That sounds simple, but it was in
reality a fearfully expensive undertaking. The mile of Brilliant cut-off,
"heavy work" every inch of it, cost $5,500,000, and is to-day the most
expensive mile of railroad track in the world.
But the gripping hand was off the traffic throat of Pittsburgh and
commercial Pittsburgh breathed more easily once again. The Union Station
and its approach tracks were restored to passenger uses; and in the course
of things the Pennsylvania tore down the old station, built a new one, and
wiped out the two wicked city crossings, as with the stroke of an
Aladdin's hand.
So much for Pittsburgh. Now consider the great new freight line leading to
the east from there. Not all of that railroad has yet been built, but the
greater part of it is already completed, and every part of the old road
that was under tension because of freight congestion has already been
relieved.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account