The building of the new station has offered tremendous problems to the
engineers, for it has demanded a complete reconstruction within extremely
limited area, while not placing hindrances in the way of the constant
operation of one of the world's greatest terminals. Coincident with the
rebuilding of the new station has come the substitution of electricity for
steam on the terminal lines of its two tenants, the New York, New Haven, &
Hartford, and the New York Central & Hudson River Railroads. In order to
work the three-mile tunnel through Park Avenue and the sole entrance for
trains to the station at greatest capacity, it was found necessary to
extend the yards of the new station far north of those of the old. This
work, alone, has necessitated the acquisition of whole city blocks of
tremendously valuable real estate and the excavation of several million
cubic yards of rock and earth.
To accomplish the work of reconstruction and still enable the station to
handle its great traffic without serious interruption, serious forethought
and definite plans of action were found necessary. The plan was developed
by constructing a temporary building of brick and plaster covering a
vacant city block in Madison Avenue, at the west of the station. Into this
temporary structure a branch post office, an important adjunct of the
Grand Central, was moved from the extreme eastern side of the terminal.
Excavation for the new terminal began at its eastern edge and at that edge
the first portions of the new structure have been completed. A
waiting-room was then established in temporary quarters, the last vestiges
of the old Grand Central removed, and the main front and centre of the new
station fabricated. Similarly, as the excavation has progressed from the
east to the west side of the terminal, the great bulk of the traffic has
been gradually shifted from the old high-level to the new low-level.
The new Grand Central complete will have its main train-shed devoted to
through traffic. A second train-shed of similar arrangement and of
slightly smaller dimensions will be constructed underneath the main shed
for suburban traffic, and a single head-house will serve both floors. The
head-house will have as its chief architectural feature, a concourse of
mammoth proportions. The lesser features of the new Grand Central will
contribute to make the new terminal, built upon the site of the historic
old, one of the world's greatest gateways. The fact that steam locomotives
are absolutely prohibited from entering either of the two new stations on
Manhattan Island makes these the cleanest railroad terminals yet built.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account