[Illustration: THE INTRICACY OF TRACKS AND THE "THROAT" OF A MODERN
TERMINAL YARD: SOUTH STATION, BOSTON, AND ITS APPROACHES]
You speak of his yard as being overwhelmingly big. He answers in his
deliberate way:
"We've more than 200 miles of track in this yard; something more than
2,000 switches operate it."
Then he takes you down from his office, elevated in an abandoned
switch-tower, and looking down upon his domain. He explains with great
care that, his yard being a main-line division point and not a point with
many intersecting branches or "foreign roads," its transfer-house is
inconsequential. The same process that goes forward with the
package-freight in the transfer-houses, Randall carries on in this yard
with cars. These operations are separated for east-bound and west-bound
freight and each is given an entirely separate yard, easily reached from
the group of roundhouses that hold the freight motive power of that part
of the system. Randall's, being an unusually large yard, further divides
these activities into separate yards for loaded and empty cars on the
west-bound side. No east-bound "empties" are handled over his road.
We follow him to the nearest operating point, the west-bound
classification yard for loaded cars. In the old days this was a broad flat
reach of about 20 parallel tracks, terminating at each end in approaches
of lead of "ladder" track. Upon each set of 3 or 4 tracks a switch-engine
is busy in the eternal classification process. In these more modern days
you may see the "hump" or gravity-yard, although you will still find
skilled railroaders who are prejudiced against its use. In the hump-yard
half of the work of the switch-engines is done by gravity. This new type
of railroad facility has an artificial hill, just above the termination of
the parallel tracks where they cluster together, and upon this hump one
switch-engine with a trained crew does the work of six engines and crews
in the old type of yard.
A preference freight rolls into the receiving yard for the west-bound
classification. Its engine uncouples and steams off for a well-earned rest
in the smoky roundhouse. A switch-engine uncouples the caboose that has
been tacked on behind over the division, and it is shunted off to the
near-by caboose track, where its crew will have close oversight of
it--perhaps sleep in it--until it is ready to accompany some east-bound
freight a few hours hence.
Blue flags (blue lights at night) are fastened at each end of the
dismantled cars, and the inspectors have a quarter of an hour to make sure
if the equipment is in good order. If the car is found with broken
running-gear it is marked, and soon after drilled out from its fellows,
sent to the transfer-house to have its contents removed, to the shops for
repairs, or the "cripple" track for junk, if its case is well-nigh
hopeless.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account