The existing kerb to be taken up and replaced by inches by
inches granite kerb in lengths of not less than inches,
to the lines shown on plan, and to the levels marked on sections.
The water-tables or gutter to be channelled with properly laid,
and bedded on fine gravel to the levels and inclinations marked on
sections.
The footpaths shall be properly formed, bottomed, and drained where
required; the formation level made to the inclination shown on
section, and afterwards coated with .
The whole of the above-mentioned works to be executed by you in
accordance with the plan and sections hereinbefore referred to and now
open for inspection at the surveyor’s office as aforesaid, and of the
dimensions, widths and levels shown thereon, and to be done in a good,
workmanlike and substantial manner, to the satisfaction of the said
urban sanitary authority and of their surveyor.
An estimate of the probable cost of the said work, prepared under the
direction of the surveyor to the said urban sanitary authority, is
also lying for inspection at the office of the said surveyor, in
manner required by section 150 of the Public Health Act 1875.
Dated this day of 18 .
____________________
_Town Clerk_.
The clause then goes on to say “If such notice is not complied with.”
It would be a most difficult and costly proceeding for any individual
owner of property to execute the work for half the width of the street
opposite his length of frontage, and the result would be anything but
satisfactory if the owners of the properties were to comply with the
notices in this manner.
If the owners do intend to comply with the notice, and carry out the
work themselves, the best method for them to adopt is to hold a meeting
and decide upon having it done, then to appoint one of their number, or
some other person to superintend or carry out the work, and afterwards
collect the money, but this is very seldom done, and the wisest course
(which is generally adopted) is not to comply with the notice, but let
the urban authority execute the work themselves. This again entails
considerable labour upon the town surveyor, who has to superintend the
work and see that all the details contained in the statutory notices are
properly carried out, but his labour does not end here. Upon the
completion of the work the amount expended has to be recovered “from the
owners in default according to the frontage of their respective
premises, and in such proportion as is settled by the surveyor of the
urban authority, or (in case of dispute) by arbitration.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account