The Municipal and Sanitary Engineer's HandbookBoulnois, H. Percy (Henry Percy)
Science
The Municipal and Sanitary Engineer's Handbook
Boulnois, H. Percy (Henry Percy)
Municipal engineering; Sanitary engineering
No hard and fast lines can be laid down as to the best method to be
adopted for the disposal of the sewage of any town, but the peculiar
circumstances of each case must be considered before advice could be
given on the subject: geographical position, physical arrangement,
habits of the population, and the character and quantity of the sewage
of the town being some of the most important.
In any case it is necessary that the transmission of the sewage to the
outfall should be effected as speedily as possible, and that the
position of this outfall should be such as to cause no nuisance. The
contents of the sewers should, if possible, be emptied by gravitation,
as pumping is a constant expense, and economy with efficiency must of
course be studied.
Up to the present time the following are the methods adopted in this
country for the disposal of sewage:
(1.) Passing the sewage in its crude state into the sea or tidal river.
(2.) Passing the sewage in its crude state over large tracts of land;
this is called broad irrigation.
(3.) Passing the sewage in its crude state on to small tracts of land
previously prepared by deep drainage; this is called intermittent
downward filtration.
(4.) Mechanical subsidence of the sewage in large tanks, the effluent
passing on to land or into a river.
(5.) Mechanical filtration of the sewage, the effluent passing on to
land or into a river.
(6.) The introduction of lime or other precipitant into the sewage,
which is allowed to settle in tanks, the effluent passing on to land or
into a river.
Very little need be said upon the first of these methods. Many engineers
of high standing contend that, where practicable, the sea or the tidal
estuary of a river is the right place for the sewage, as no costly works
are necessary, and an abominable nuisance is thus got rid of at once and
for ever. To ensure this, however, great care must be exercised in the
selection of the site for the outfall. Float observations should be
made, not only of the surface tides and currents, but also of those at
different depths, and the effect upon the sewage by its different
specific gravity from that of the salt water must be allowed for, as
well as the difference of level of the tides and the configuration of
the adjoining coast line.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account