The first thing therefore that a local authority has to do is to frame
the necessary regulations and appoint a “person to superintend the
making of such communications.”
The following is given as a specimen form of the manner in which these
regulations may be compiled:[208]
_Regulations made and ordained by the Urban Sanitary Authority for
, as to the giving of notice before any drains are made to
communicate with the sewers of the said Urban Sanitary Authority;
regulating the mode in which such communications are to be made; and
appointing the person under whose superintendence and control the work
is to be executed._
1.--No communication shall be made with any sewer belonging to the said
Urban Sanitary Authority, nor any drain made to empty therein, unless
notice of an intention so to do, signed by the owner or occupier of the
premises to which such drains belong, be left at the office of the
borough surveyor two days previously; and such notice must specify the
point at which it is desired that communication shall be made, and the
time at which it is proposed the work shall be commenced, and any person
not complying with these regulations will be liable to a penalty not
exceeding twenty pounds.
2.--Work required to be done in connecting any house drain or drains
with the main or public sewer, shall be executed in the following
manner:
The ground to be excavated to the required depth with all possible
expedition, the work to proceed by night and day; and there shall be
maintained during the progress of the work all such fencings, hoardings,
struttings, and shorings, as may be necessary for or in consequence of
any of the works, for the protection of the public, and of all buildings
and property whatever, near to or liable to be affected by the work,
which shall also be well watched and lighted.
The shoring and strutting of the excavation is to be done in such
manner, with poling boards, waling pieces and struts, as the surveyor
shall consider necessary.
All surplus earth or material is to be carted away as speedily as
possible. Care must be taken where the excavation is made in a road or
path to keep separate the surface material from the lower, so as to
replace them in their proper positions.
The excavation shall in all cases where practicable be in open cutting,
and not by shafts and headings.
The junction with the main sewer to be done in the following manner:--
The drain shall in no case be less than four inches internal diameter,
and shall be constructed of well-burnt glazed socketed stoneware pipes,
circular, perfectly true in bore, and straight, with whole socket joints
free from flaws, blisters, cracks, or other defects, set in Portland
cement joints with a uniform fall, well bedded on well-rammed and solid
ground, the sockets being sunk into it so as to give an even bearing.
No shafts or sudden falls will be allowed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account