(7.) If this work is not done within a reasonable time the local
authority “may if they think fit” execute the works; the surveyor has
probably to carry them out, after having obtained the necessary
permission to enter for the purpose.
(8.) The costs of the work have to be recovered.
Anyone acquainted with local government will know how difficult and
tedious such processes must necessarily be, the delay between the
meetings of the local authority being quite sufficient to make the
matter in dispute last a considerable time, and this delay is extremely
undesirable where a nuisance arising from a defective house-drain is in
existence.
There seems to be no doubt that the clauses which are given in the
Public Health Act 1875 empower the local authority to specify without
dispute the class of work they think necessary in order to remedy any
evils arising from a defective drain, but it is a pity that some more
simple process cannot be introduced to improve the sanitary condition of
a house without the necessity of so much laborious legal machinery.
There is still one other clause in the Public Health Act 1875, which
refers to house drainage, and it is as follows:
“Every local authority shall provide that all drains, waterclosets,
earthclosets, privies, ashpits, and cesspools within their district be
constructed and kept so as not to be a nuisance, or injurious to health”
(38 & 39 Vic. c. 55, s. 40). But this clause is usually taken to apply
rather to nuisances arising from temporary defects than to more
important structural defects in a drain, and such nuisances come more
under the cognizance and duties of the inspector of nuisances than those
of the town surveyor.
It would not be possible, as I have already stated, in one chapter to
give all the detail descriptions of house drains and the necessary
apparatus in connection therewith, and besides very many excellent
books, pamphlets and papers have been from time to time written on this
important subject.[213] Before, however, bringing this chapter to a
conclusion, I will give a list of the essential requirements of all good
house drainage which may be of some use to the town surveyor:
(1.) A house drain should be constructed of stoneware pipes (not
earthenware or fire clay), these are generally salt glazed, and should
be perfectly smooth or even slippery inside, the pipes must be of true
circular section and thickness of material, and straight in the
direction of their length, with whole sockets of proper depth, and free
from any cracks, blisters, sand holes, or other defects. As even the
most carefully manufactured pipes vary somewhat in diameter of sockets;
&c., it is well to have them sorted before commencing the work; it is
scarcely necessary to add that no “seconds” should be allowed on the
works.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account