The Municipal and Sanitary Engineer's HandbookBoulnois, H. Percy (Henry Percy)
Science
The Municipal and Sanitary Engineer's Handbook
Boulnois, H. Percy (Henry Percy)
Municipal engineering; Sanitary engineering
(1.) It is said to absorb moisture and to smell offensively, but this
has often been refuted.[81] (2.) It is said to be difficult to cleanse
without the aid of water, as dirt adheres to the wood, and lingers in
the joints.
(3.) It is not easy to open it or repair it, for the purposes of gas and
water pipes, etc., and rather a large surface has to be removed for this
purpose, and it has to be left a little time after repairs before
traffic is again allowed on it.
(4.) The wood swells if wet, and cases are on record of the side kerbs
of streets being raised, and lamp posts thrown down, by the pressure of
the wood thus swelling.[82]
With regard to the cost of wood paving. This must vary in different
localities, according to the value of labour, of materials, and in the
manner in which the work is done.
The practice of most of the companies engaged in this class of work is
to make a fixed charge per square yard for the pavement, including the
concrete but excluding the excavation, and they also guarantee to keep
the pavement in repair free of charge for one or two years, and then
for so many years after, at so much per yard per annum.
About 14_s._ per square yard is generally the first charge for
constructing, and 1_s._ per square yard is the annual charge for
maintenance.
Upon the subject of cost the following tables[83] may be useful.
TABLE SHOWING THE ACTUAL DURATION AND COST OF CERTAIN WOOD PAVEMENTS IN
THE CITY OF LONDON.
-----------+----------+----------+-----------+-----------+-----------
| | | | Total Cost| Average
| | | First Cost| of Repairs| Cost
| | | per | per Square| per Square
|Date when | | Square |Yard during| Yard per
Situation.|laid New. | Life. | Yard. | Life. | Annum.
-----------+----------+----------+-----------+-----------+-----------
| |Yrs. Mths.|£ _s._ _d._|£ _s._ _d._|£ _s._ _d._
Cornhill |May, 1855 | 10 2 |0 12 2 |0 17 4¹⁄₂|0 2 11
|July, 1865| 6 8 |0 11 6 |0 8 9³⁄₄|0 3 0¹⁄₂
| | | | |
Gracechurch|Nov. 1853 | 11 7 |0 12 8 |0 17 1¹⁄₂|0 2 6³⁄₄
Street |June, 1865| 6 0 |0 11 6 |0 6 11 |0 3 0³⁄₄
| | | | |
Lombard |May, 1851 | 9 4 |0 9 6 |0 6 0 |0 1 7³⁄₄
Street |Sept. 1860| 10 7 |0 9 2 |1 0 2 |0 2 9
| | | | |
Lothbury |May, 1854 | 12 3 |0 12 6 |1 8 4³⁄₄|0 3 4
|Aug. 1866 | 6 1 |0 12 6 |0 3 5³⁄₄|0 2 7¹⁄₂
| | | | |
Mincing |July, 1841| 19 1 |0 14 4 |0 13 4 |0 1 5¹⁄₄
Lane |Aug. 1860 | 13 0 |0 9 2 |1 2 6³⁄₄|0 2 5¹⁄₄
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account