The Municipal and Sanitary Engineer's HandbookBoulnois, H. Percy (Henry Percy)
Science
The Municipal and Sanitary Engineer's Handbook
Boulnois, H. Percy (Henry Percy)
Municipal engineering; Sanitary engineering
(2.) The fact of uneven wearing: one stone will be found soft next to a
hard one; the former wears, leaving a pit which forms a pool for water
in due course, and has to be removed.
(3.) Unless very carefully bedded, a stone will see-saw; this is very
unpleasant in wet weather, water accumulates beneath, and as the
pedestrian treads on one end of the stone a squirt of dirty water up to
his knees, and a stumble, remind him that the stone is loose.
(4.) Liability to crack when any heavy goods are thrown upon it.
The following specimen specification for Yorkshire flagging pavement may
be of use.
_Specimen Specification for Yorkshire Flagging Foot Pavements._
The old flagging (where and when directed) to be taken up, refaced,
squared, and relaid.
The new flagging is to be chisel-dressed to a fair face, true, out of
winding, and not less than 3 inches thick,[106] to be properly squared
and not pitched off only, or undercut, but to hold good to the square;
to have not more than fourteen pieces to the hundred superficial feet;
the joints must be set flush, and bedded and pointed with the best blue
lias mortar.
The bed for the flagging both old and new, if any is required, to be
made with proper earth, gravel, or dry rubbish, and all surplus earth
and rubbish to be carted from the streets as it arises from the works.
The flagging to be properly cut and rebated to receive all area
gratings, coal shoots, rain water troughs, &c.
Any damage done to gas or water service pipes in digging for the
flagging, or in any way connected with the work, to be made good by the
contractor, as also all and every other damage to windows, wood, or
glass work; and the contractor will be held responsible for, and will
make compensation for any injury that the public may sustain through the
negligence of his workmen, or otherwise.
The whole of the flags to be of the very best quality, from Halifax, the
quarries in the neighbourhood of Bradford or in Yorkshire, and subject
to the approval of the surveyor.
The contractor to provide all lights and proper guards at night, and
when old paving is to be taken up the work is to be done under the
direction of the surveyor, and if considered necessary, the stones are
to be removed from the streets to be re-faced and squared. No stone to
be stacked in the streets.
The flagging to be measured after the work is completed.
The contractor to provide all stone, materials, tools, implements, horse
and cart hire, and pay all railway dues, freightages, etc., and also to
provide all labour of every kind for properly completing the work to the
full and entire satisfaction of the surveyor. Payment will be made as
the work proceeds, on the certificate of the surveyor.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account