_Method of Mixing._--On a clean flagged or wooden floor spread three
barrow-loads of ashes, then about one barrow-load of lime, and so on
until the whole of the dry materials (or one mixing) has been spread;
then throw over them about three bucketfuls of tar, and before mixing it
with them add (say) six bucketfuls of water; then mix as for concrete,
and when the liquids are pretty well absorbed add a similar quantity,
mix again, and so on until all the liquids have been absorbed; the mass
will then be something of the consistency of ordinary mortar. Next pass
the whole three times _at least_ through a pug mill: if this be not done
the concrete will be a failure. An ordinary hand pug-mill will not be
sufficient; the knives are not strong enough, nor will it incorporate
the materials thoroughly, but an upright pug-mill, worked by steam power
where practicable, or by at least one horse, should be used.
It will be found that as the mass emerges from the pug-mill a large
proportion of the water will run from it; means should therefore be
provided for allowing the water to escape freely from the floor.
_Method of Laying._--Prepare the path for a layer of concrete 3 inches
in thickness, on a hard dry bottom, inclining from the inside to the
kerb, at the rate of ¹⁄₂ an inch to a foot for pathways not more than 6
or 7 feet wide, but for wider pathways an inclination of ³⁄₈ of an inch
to a foot will be sufficient.
A template the full width of the path having been provided, lay concrete
with a shovel on the inner side of the path for a length of (say) 15
feet and a width of 1 foot, at such a height that when it has been well
rammed and patted with shovels it shall be the exact height intended for
the path; this is to form a resting-place for one end of the template,
the kerb forming that for the other end; then fill the intervening space
with concrete up to the template, treading and ramming it solidly for
about twenty minutes, and as it gets into shape, patting it with shovels
and smoothing with a trowel; then, with an iron (not stone) roller
weighing about 5 cwts., roll for two hours, trimming and filling up
hollows where necessary; then go on with another length, and
occasionally roll the first for half-an-hour, and so on. Experience
alone will decide the quantity of rolling necessary after the first day
or two, as weather and other causes tend to a more rapid solidification
of the concrete at some times than at others.
On the third day, sprinkle a small quantity of sea or other very fine
sand on the concrete, and allow it to remain for two or three days after
the path has been in use--it should then be removed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account