The Nation's River: A report on the Potomac: From the U.S. Department of the InteriorUnited States. Department of the Interior
History
The Nation's River: A report on the Potomac: From the U.S. Department of the Interior
United States. Department of the Interior
Potomac River
(a) Individual reservoirs should be susceptible to reevaluation and
modification during design stage in light of new techniques of
water supply--including demonstrated feasibility and acceptability
of the upper estuary for this purpose--and of water quality
control, or unforeseeable modifications of aims or expected
demands, should such change be determined to be beneficial to the
overall well-being of the Basin.
(b) Prior to construction of any reservoir with benefits for
recreation and water quality downstream, responsible State and
local agencies should be required to furnish assurances that the
recreational and scenic qualities of the banks of the rivers so
benefited will be amply protected.
(3) By the continuing assessment by the Corps of Engineers of the
water supply needs of the Washington metropolitan area with the
objective of meeting future demands as they develop.
(4) By research and investigation to ensure a sound scientific
basis for future action in relation to the Basin's water resources
and to provide maximum flexibility of choice to technicians,
planners, and decision makers:
(a) A full-scale and continuing water data collection program to be
conducted in the Basin by the U.S. Geological Survey, with the
object of building and keeping up to date the facts relevant to the
river system and related aquifers.
(b) Specific and continuing research by the Department of the
Interior as well as other agencies into the nature and feasibility
of a full range of possible alternative sources of water supply in
the Basin, including new technological approaches.
(c) A special study should be made, based on extension and
coordination of studies now authorized or under way to determine
the feasibility and acceptability of using the upper estuary as a
future source of domestic water to supplement the water supply for
the metropolitan area. The States of Maryland and Virginia, the
District of Columbia and the Metropolitan Council of Governments
should also be associated with this study.
b. To begin to cope with major or general flooding problems in the
Basin and to prevent future potential flood damages, the following
actions should be taken:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account