In 1885, the late Thomas Evershed, of Rochester, New York, devised a
plan for wheel-pits a mile and a half above the Falls. The water was to
be conducted to these pits by lateral canals, from which it was to be
taken to the river below the Falls by means of a tunnel cut through the
solid rock. This plan seemed more practicable than any proposed
heretofore, and commanded the attention of many leading engineers of the
country. The present great developments at the Falls had their
inception in the organisation of the Niagara Falls Power Company. This
company obtained a charter from the State of New York in 1886, giving
them permission to use water sufficient to generate two hundred thousand
horse-power. This company could accomplish very little on account of its
limited capital. In a short time, however, New York capitalists and
bankers, perceiving the practicability of the company's plans, became
interested in the project, and furnished the necessary funds. The first
earth was turned for this great work in October 1890 and the tunnel was
completed in the autumn of 1893. The first main wheel-pit was ready for
its machinery by the following March.
The device for applying Niagara's power to the turbines is on the same
principle of construction, in each of the recently erected plants as in
this first one. In the case of the Niagara Falls Power Company, a broad
deep inlet leads from the river at a point a mile and a half above the
American Falls, two thousand feet back in a north-easterly direction.
The canal is protected by a lining of heavy masonry, which is pierced at
its upper end by a number of gateways; through these water is admitted
by short canals to pits emptying into huge steel pipes or penstocks, as
they are called. These penstocks terminate at the bottom in wheel boxes,
in which are placed the bronze turbine wheels, connected with the
surface by means of steel shafts parallel to the penstocks. From the
turbine wheels the water whirls and rushes on through a subterranean
passage to the main tunnel. Here it starts on its long journey of over a
mile under-ground, beneath the heart of the city, until it emerges again
at an opening in the cliff just below what is known as the new
suspension bridge. A very ingenious plan was adopted for the application
of the power to the turbines. The penstocks are brought down under the
wheels and are made to discharge their waters upward into the boxes.
This contrivance causes the water to bear up the great weight of the
wheels, from the bearings beneath for their support, besides that of the
hundred and forty feet of shafting connected with the turbines for
transmitting power to the surface.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account