The Panama CanalHaskin, Frederic J. (Frederic Jennings)
History
The Panama Canal
Haskin, Frederic J. (Frederic Jennings)
Panama Canal (Panama)
Although the distance between the Atlantic and Pacific ports of the
United States would have been more than 400 miles shorter by the
Nicaragua Canal than by the Panama Canal, it would have taken about 24
hours longer to pass through the former than through the latter, so
that, as far as length of time from Atlantic to Pacific ports was
concerned, the two routes would have been practically on a par. The
total amount of material it would have been necessary to excavate at
Nicaragua approximates, according to the estimates, 228,000,000 cubic
yards. This would have been increased, perhaps, by half, to make a
canal large enough to accommodate ships such as will be accommodated
by the present Panama Canal.
The three great trans-Isthmian projects may be said to have been: The
Panama Canal, the Nicaraguan Canal, and the James B. Eads ship railway
across the Isthmus of Tehauntepec. The latter proposition seems to be
the most remarkable, in some ways, of them all. In 1881, James B.
Eads, the great engineer who built the Mississippi River bridge at St.
Louis, and whose work in jetty construction at the mouths of the
Mississippi proved him to be one of the foremost engineers of his day,
secured a charter from the Mexican Government conveying to him
authority to utilize the Isthmus of Tehauntepec for the construction
of a ship railway from the Atlantic to the Pacific. His plan called
for a railway 134 miles long, with the highest point over 700 feet
above the sea, and designed to carry vessels up to 7,000 tons. He
calculated that the entire cost of the railway would not be more than
$50,000,000. His plan was to build a railroad with a large number of
tracks on which a huge cradle would run. This cradle would be placed
under a ship, and the ship braced in the manner of one in dry dock.
Heavy coiled springs were to equalize all stresses and to prevent
shocks to the vessel. A number of powerful locomotives would be
hitched to the cradle and would pull it across the Isthmus. Although
the proposition was indorsed by many authorities, it seems to anyone
who has crossed the Isthmus of Tehauntepec that it was a most
visionary scheme.
[Illustration: COL. CHESTER L. HARDING
THE GATUN UPPER LOCKS]
[Illustration: LIEUT. COL. DAVID D. GAILLARD
CULEBRA CUT, SHOWING CUCARACHA SLIDE IN LEFT CENTER]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account