The Panama CanalHaskin, Frederic J. (Frederic Jennings)
History
The Panama Canal
Haskin, Frederic J. (Frederic Jennings)
Panama Canal (Panama)
While the great Isthmian highway will be completed far enough ahead to
be ready to handle all traffic that offers long before the official
opening date, it will, on the other hand, never reach that stage where
dredges will not be needed. There are 22 rivers which wend their way
from the watersheds of the canal, and pour their loads of sand and
silt into it. Of course, these rivers are small--so small, indeed,
that few of them would be dignified by being called rivers in the
United States. But when the heavens open and the floods descend, as
they do so frequently during the rainy season at Panama, these usually
quiet, lazy, little streams become almost as angry as the mighty
Chagres itself, and they rush down to the canal heavily freighted with
sand and silt. If the water in the great interoceanic channel is to be
kept at its appointed depth of 41 feet, dredging perforce must be
continued from year to year, summer and winter, spring and fall. And
so it is that the dredges will be met by every ship that steers its
course from Cristobal to Balboa, or from the Atlantic to the Pacific.
Few ships large enough to tax the dimensional capacity of the locks
ever will go through the canal. Full 90 per cent of all the ships that
sail the seas could go through locks one-half the size of those at
Panama. So far as commercial shipping is concerned, a 15,000-ton
vessel plying tropical waters is considered large, and a 20,000-ton
ship is an exception. According to the best shipping authorities, the
day when vessels of more than 25,000 tons will find it profitable to
ply on the routes which lead through the Panama Canal is so far in the
future that they are not able to discern it. With reference to the
Navy, naval experts generally agree that the United States will
celebrate many a decade of passing years before a battleship too large
to use the present lock chambers is a possibility.
When a ship makes its maiden voyage through the canal, the
measurements to determine its net register will be taken by the
shipping experts in the employ of the United States. When this work
is completed the master of the ship will be required to pay the toll
before he can take his vessel through the canal. If he should fail to
pay the toll the vessel itself would be put on the block and sold at
auction, if necessary, to reimburse the United States for its passage.
However, it is not to be expected that such contingencies as these
will arise. When once a ship has been measured, the formality will not
have to be gone through with on future visits. It is not expected that
each ship will be actually measured for every dimension as it comes to
the canal on its first trip, since its net register tonnage probably
will have been determined long before, and the canal officials will
only check up the work already done elsewhere to assure its accuracy.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account