_The Mont Cenis Tunnel_ was constructed to establish railway
communication between France and Italy through the Alps. It was begun in
1857, and after having been in progress of construction for thirteen
years, was opened for traffic in 1871. This tunnel was commenced by hand
borings, being for the most part through solid rock, and its progress up
to 1862 was so slow that it was estimated that thirty years would be
required for its construction. Its earlier completion was due to the
introduction of rock drills operated by compressed air, which trebled
the rate of advance, and which device made a new epoch in all
rock-boring and mining operations. This tunnel was cut from both ends at
the same time, and so accurate were the surveys in establishing the
alignment of the two headings through the mountain mass, that, although
the tunnel was more than 7½ miles long, when the two headings came
together in the middle, only a difference of one foot in level existed
between them. When it is remembered that most of the 7½ miles of tunnel
was cut through solid rock, by boring and blasting, the immensity of the
undertaking can be appreciated. As completed the tunnel is 8 miles long,
and wide enough for a double track railway.
_The St. Gothard Tunnel_ is another tunnel through the Alps, which
involved even a longer and deeper cut through the mountains than the
Mont Cenis Tunnel. This is 9¼ miles long, and it was begun in 1872, the
headings joined in 1880, and the tunnel opened for traffic in 1882.
Although by far the largest undertaking yet made, the improvement in
rock-boring machinery enabled it to be constructed much more rapidly and
at less expense.
The Arlberg is still another Alpine tunnel. It is 6½ miles long, was
commenced in 1880, and opened for traffic in 1884.
Tunneling under rivers presents many more difficulties than driving
through the hardest rock. This is so by reason of the inflow of water.
Among successful tunnels of this kind may be named the Mersey and Severn
tunnels in England, opened in 1886, and the St. Clair tunnel between the
United States and Canada. The histories of the abandoned Detroit and
Hudson river tunnels are object lessons of the difficulties encountered
in this class of work.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account