History, Modern -- 19th century; Nineteenth century
It is curious to see how little is said about these beautiful bridges,
which the public takes as a matter of course. If they had been built
fifty years ago, their engineers would have received the same praise
as Robert Stephenson or Roebling, and justly so, as they would have
been men of exceptional genius. When these bridges were built, in 1898,
the path had been made so clear by mathematical investigation and the
command of a better steel, that the task seemed easy.
That which marks more clearly than anything else the great advance
in American bridge building, during the last forty years, is the
reconstruction of the famous Victoria Bridge, over the St. Lawrence,
above Montreal. This bridge was designed by Robert Stephenson, and the
stone piers are a monument to his engineering skill. For forty winters
they have resisted the great fields of ice borne by a rapid current.
Their dimensions were so liberal that the new bridge was put upon them,
although four times as wide as the old one.
The superstructure was originally made of plate-iron tubes, reinforced
by tees and angles, similar to Stephenson’s Menai Straits Bridge. There
are twenty-two spans of 240 feet each, and a central one of 330 feet.
Perhaps these tubes were the best that could be had at the time, but
they had outlived their usefulness. Their interiors had become greatly
corroded by the confined gases from the engines and the drippings from
the chemicals used in cold-storage cars. Their height was insufficient
for modern large cars, and the confined smoke made them so dark that
the number of trains was greatly limited.
It was decided to build a new bridge of open-work construction and of
open-hearth steel. This was done, and the comparison is as follows:
Old bridge, sixteen feet wide, single track, live load of one ton per
foot; new bridge, sixty-seven feet wide, two railway tracks and two
carriage-ways, live load five tons per foot.
The old iron tubes weighed 10,000 tons, cost $2,713,000, and took two
seasons to erect. The new truss bridge weighs 22,000 tons, has cost
between $1,300,000 and $1,400,000, and the time of construction was one
year.
During his experience the writer has seen the rolling-load of bridges
increase from 2000 to 4000 pounds per lineal foot of track, with an
extra allowance for concentrated loads.
The modern high office building is an interesting example of the
evolution of a high-viaduct pier. Such a pier of the required
dimensions, strengthened by more columns strong enough to carry many
floors, is the skeleton frame. Enclose the sides with brick, stone, or
terra-cotta, add windows, and doors, and elevators, and it is complete.
Fortunately for the stability of these high buildings, the effect of
wind pressures had been studied in this country in the designs of the
Kinzua, Pecos, and other high viaducts.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account