History, Modern -- 19th century; Nineteenth century
The adoption of American work in such bridges as the Atbara in South
Africa, the Gokteik viaduct in Burmah, 320 feet high, and others, was
due to low cost, quick delivery and erection, as well as excellence of
material and construction.
FOUNDATIONS, ETC.
Bridges must have foundations for their piers. Up to the middle of the
nineteenth century engineers knew no better way of making them than
by laying bare the bed of the river by a pumped-out cofferdam, or by
driving piles into the sand, as Julius Cæsar did. About the middle of
the century, M. Triger, a French engineer, conceived the first plan of
a pneumatic foundation, which led to the present system of compressing
air by pumping it into an inverted box, called a caisson, with air
locks on top to enable men and materials to go in and out. After the
soft materials were removed, and the caisson sunk by its own weight to
the proper depth, it was filled with concrete. The limit of depth is
that in which men can work in compressed air without injury, and this
is not much over one hundred feet.
The foundations of the Brooklyn and St. Louis bridges were put down in
this manner.
In the construction of the Poughkeepsie bridge over the Hudson in
1887–88, it became necessary to go down 135 feet below tide-level
before hard bottom was reached. Another process was invented to take
the place of compressed air. Timber caissons were built, having double
sides, and the spaces between them filled with stone to give weight.
Their tops were left open and the American single-bucket dredge was
used. This bucket was lowered and lifted by a very long wire rope
worked by the engine, and with it the soft material was removed. By
moving this bucket to different parts of the caisson its sinking was
perfectly controlled, and the caisson finally placed in its exact
position, and perfectly vertical. The internal space was then filled
with concrete laid under water by the same bucket, and levelled by
divers when necessary.
While this work was going on, the government of New South Wales, in
Australia, called for both designs and tenders for a bridge over an
estuary of the sea called Hawkesbury. The conditions were the same as
at Poughkeepsie, except that the soft mud reached to a depth of 160
feet below tide-level.
The designs of the engineers of the Poughkeepsie bridge were accepted,
and the same method of sinking open caissons (in this case made of
iron) was carried out with perfect success.
The erection of this bridge involved another difficult problem. The mud
was too soft and deep for piles and staging, and the cantilever system
in this site would have increased the cost.
A staging was built on a large pontoon at the shore, and the span
erected upon it. The whole was then towed out to the bridge site at
high tide. As the tide fell, the pontoon was lowered and the steel
girder was placed gently on its piers. The whole operation was
completed within six hours. The other five spans were placed in the
same manner.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account