Once the contract was ratified by parliament and by the Grand Trunk,
and the new company had been formally organized with Mr Hays as
president and Mr Frank Morse, and later Mr Chamberlin, formerly of the
Canada Atlantic, as general manager, the work of surveying and
determining the route began. On the government section political
difficulties were met in New Brunswick, from the advocates of a route
down the St John to the city at its mouth, and engineering difficulties
of many forms in the long trail through the northern wilderness. The
bridge which was being constructed by an independent company across the
St Lawrence at Quebec collapsed in 1907, with great loss of life, and
the delay in completing the second bridge made it necessary to depend
upon car-ferries for some time. On the western section a good route
through the prairies was decided upon, not without vigorous protest
from the Canadian Pacific because of the close paralleling of its line.
After repeated surveys of the {216} Peace, Pine, Wapiti, and Yellowhead
Passes, the last was chosen, and a line was settled upon down the
Fraser and Skeena valleys, passing through two million acres of fertile
land. Remarkably low grades were secured; in fact, as favourable as on
the prairie section. Kaien Island, 550 miles north of Vancouver, was
chosen as the terminus, rather than Port Simpson as originally
designed, and soon on its magnificent harbour and most unpromising site
of rock and muskeg the new and scientifically planned city of Prince
Rupert began to rise.
As the main line ran far to the north of the St Lawrence lake and river
system, the original plan provided for the construction of branch lines
to Fort William, to North Bay, and to Montreal. Of these only the
first, aided by the Dominion and also by the Ontario government, was
built. For the connection with North Bay running rights over the
provincial road, the Timiskaming and Northern Ontario, sufficed.
Later, in 1914, the Dominion government itself decided to build the
Montreal branch. In Alberta and Saskatchewan over 1200 miles of branch
lines were begun, under guarantees of bonds by the provincial
governments. In British Columbia an independent {217} road, projected
by the contracting firm of Foley, Welch and Stewart--the Vancouver,
Pacific and Great Eastern--promised when completed to give the Grand
Trunk Pacific, by a traffic agreement, entrance into Vancouver.
The first contracts on the main line were let in 1905. For ten years
construction went on, at the rate of a mile a day, with occasional
slackening from scarcity of labour or financial stringency, but with no
complete halt. Last to be completed were the section to be built by
the company in the Central plateau of British Columbia and the section
built by the government west of Cochrane. Meanwhile, the prairie lines
had been in operation through to Edmonton since 1910, and grain reached
Fort William over the Lake Superior branch in the same year.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account