Work was begun at the east end of the line, from the point of junction
with the Canada Central, but at first energy was devoted chiefly to the
portion crossing the plains. Important changes in route were made.
The main line had already been deflected to pass through Winnipeg. Now
a much more southerly line across the plains was adopted, making for
Calgary rather than Edmonton. The new route was shorter by a hundred
miles, and more likely to prevent the construction of a rival road
south of it later. For many years after the Palliser-Dawson-Hinds
reports of the late fifties, it had been assumed that the tillable
lands of the West lay in a 'Fertile Belt' or rainbow, following roughly
the Saskatchewan valley and curving round a big wedge of the American
desert projecting north. Certainly the short, withered,
russet-coloured grass lands of the border country looked forbidding
beside the green herbage of the North Saskatchewan. But in 1879
Professor Macoun's investigations had shown that the southern lands had
been belied by rumour, and that only a very small section was
hopelessly arid. With this objection removed, the only drawback to the
{161} southern route was the difficulty of finding as good a route
through the mountains as the northerly Yellowhead Pass route afforded,
but on this the company decided to take its chances.
Work on the plains was begun in May 1881, and by the end of the year
161 miles had been completed. This progress was counted too slow, and
under Van Horne's management a contract was made in 1882, with Langdon
and Shepard of St Paul, to complete the line to Calgary. Later in the
year a construction company was organized, the North American Railway
Contracting Company, to build all the uncompleted sections of the main
line for $32,000,000 cash and $45,000,000 common stock. This was
really a financing rather than a construction expedient, and was
abandoned within a year.
In this section the engineering difficulties were not serious, but the
pace of construction which was demanded, and the fact that every stick
of timber and every pound of food, as well as every rail and spike, had
to be brought a great distance, required remarkable organization.
Three hundred sub-contractors were employed on the portion of the line
crossing the plains. Bridge-gangs and track-layers {162} followed
close on the graders' heels. In 1882 over two and a half miles of
track a day were laid. In the following year, for weeks in succession,
the average ran three and a half miles a day, and in one
record-smashing three days twenty miles were covered. By the end of
this year the track was within four miles of the summit of the Rockies.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account