The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
This South American line is not an ordinary mountain railway: it is
an audacious marvel of engineering science. Nor does it merely offer
facilities for sight-seeing among the impressive Cordilleras, but acts
as a traffic highway between the coast and the mines on the high inland
plateau.
As might be supposed, the difficulties which the engineers had to break
down were numerous and stupendous. Moreover, the work was extremely
costly. In the case of the Oroya road it averaged about £60,000, or
$300,000, per mile, and altogether £8,500,000 ($42,500,000) were
sunk in the enterprise--more than the total cost of the St. Gotthard
railway, with its famous tunnel and 172 miles of track.
The first attempt to subjugate this range by the iron road was made
in the ’sixties by a daring Philadelphia engineer, Henry Meiggs. His
idea was ambitious in the extreme. He proposed to start from Callao,
lift the metals over the crests of the mountains, drop down the other
side on to the highlands, and to push across the plateau until he
gained a point on the mighty Amazon which could be reached by steamer
from the Atlantic. By this means the Pacific seaports of South America
would be brought into closer touch with the markets of the Old World,
avoiding the protracted and hazardous journey round Cape Horn. That
the idea was never carried to success was one of the sorry tricks of
Fate. Internecine strife and wars with neighbouring states sapped the
financial strength of Peru to such an extent that there was not enough
money to complete this grand scheme. Possibly some day the steel
thread will be picked up again at Oroya and forced to its original
objective.
For the first 107 miles this railway makes a continual ascent; there is
not a single foot of downhill in the whole distance. Work was commenced
in 1870, and was pushed forward so energetically that in the course
of twelve months Meiggs had completed 20 miles of the line, and had
the earthworks well advanced as far as Chosica, some 33 miles out of
Callao. In order to ease his task as much as possible, the engineer
decided to follow the Rimac River into the mountains. But as the
innermost recesses of the Cordilleras are gained, the river narrows
considerably, until it plunges merely through a slender defile, the
walls of the peaks dropping down precipitously into the water. The
result was that the engineer found it very difficult to find a natural
lane for his metals, so he had to hew and blast galleries, to swing
first from one bank to the other, in order to seize the slightest
foothold.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account