So energetically did Meiggs pursue his self-appointed task that in six
years he had carried the line 88½ miles into the Andes, and had gained
an altitude of 12,215½ feet. All the men that he could possibly procure
were pressed into service; at one time the railway gave employment
to 8000 labourers. The amount of blasting necessary to prepare the
road-bed for this single line of standard track was enormous, something
like 500,000 pounds of explosives being used every month. The strain
inseparable from such an enterprise told its tale at last upon the bold
engineer, whose iron constitution could not withstand the anxieties
and worries of the Verrugas fever, and the exposure to a rarefied
atmosphere, without receiving an indelible mark. The first signs of a
complete breakdown appeared as the railway was approaching Chicla, and
when this point was gained in 1877 he succumbed.
The removal of the guiding spirit brought the whole undertaking to
a stop. Meiggs had completed two-thirds of the undertaking, and had
broken the back of the difficulties. For fourteen years not another
foot of line was graded. At last the Peruvian Corporation of London,
which had taken over the railway, settled a contract for its completion
with William Thorndike, who also hailed from Philadelphia.
The new engineer carried the line a further 3,450 feet above the sea,
following the surveys of Meiggs, and then became confronted with his
greatest obstacle--the piercing of the summit crest. Thorndike had
to hew his way through the bosom of a pinnacle for over 3,855 feet
at an altitude at which such work never had been attempted before.
The trying character of the situation was augmented by the rarity
of the atmosphere, and the fact that he had to force his way through
the region of the terrible mountain sickness, with a low prevailing
temperature such as is encountered in the region of eternal snow and
ice. Such conditions retarded the boring of the Galera tunnel, as it
is called, more than the stern resistance of the rock. The workmen
invariably fell victims to the sickness, though the undertaking was
not accompanied with the heavy mortality that characterised the
building of the Verrugas bridge far below. Mountain drilling, blasting,
excavating, and the removal of the heavy spoil proved exacting and
fatiguing, and a man could work only for a few hours at a stretch. By
skilful organisation and careful husbanding of his forces, however, the
engineer succeeded in forcing the metal track through the mountain at
record speed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account