The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
On this road, however, the moving sand threatened to be an implacable
enemy. In the higher altitudes the sand is piled up into quaint little
cones ranging from ten to twenty feet in height, and from the distance
their incalculable number and regular lines present the appearance of
a vast army of men grimed and covered with the dust, which illusion
becomes emphasised when they are seen moving across the plains in a
steady, rhythmic manner under the influence of the wind. When the
railway was built it was anticipated that elaborate precautions would
be requisite to keep the track clear of this encumbrance, but it was
found that the trains could plough their way through the mass with
little difficulty.
In the higher levels the sand gives way to a country of broken rock--a
land absolutely void of any sign of life. This monotonous waste
continues to the shores of the lake, where the dank water-grass and
limpid water offer a welcome relief to the aridity experienced for so
many hours. This railway was constructed with remarkable rapidity for
the Land of Paradoxes, as the whole 332 miles were built in five years,
and thus the isolated waters of Titicaca were linked with the Pacific
by the iron road.
Not only was this railway much cheaper to construct than the Central
or Oroya line, but its maintenance is not so harassing as the former
system. The engineers of the Oroya road are engaged in a constant war
with the elements. The landslide is the most relentless foe that has
to be combated. A big slip on a slope, an avalanche of snow, huge
boulders, and miscellaneous debris rattle down the mountain-sides with
terrific fury, blotting out the track and sweeping bridges away in
their mad career.
The Verrugas bridge was dogged by ill-fortune after its completion,
for in one of these visitations the whole structure was demolished
through the main central pier being knocked away. The tangled and
twisted metal was left rusting in the ravine, for the bridge-builders’
art had advanced considerably since the old bridge was designed, and
in reconstruction it was found possible to span the gorge on the
cantilever principle without the central support. All the other bridges
on the railway are being rebuilt gradually on these lines, and when
this task is completed the engineer will have one danger the less to
fear--the collapse of the slender link of communication across the
gulches.
One can enjoy a most exhilarating experience on this railway. This
is the descent from Galera tunnel to Callao on a small hand-car. It
is a glorious coast downhill for no less than 107 miles. One rushes
down inclines, swings round curves, threads tunnels, and whisks across
gorges at the exhilarating speed of 45 miles an hour. It is a unique
sensation--one of the many marvels associated with this remarkable
railway, which is not merely a striking evidence of civilisation, but a
perpetual monument to the 7000 lives devoted to its construction.
CHAPTER XI
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account