Actual construction was commenced without delay, the task being
undertaken by the Cleveland Engineering & Bridge Building Company
of Darlington, who, by the successful completion of this task, once
more emphasised the predominance of the British bridge-building
engineer. The main span is a graceful curve of steel springing from the
cliff-face on either side, the latter being excavated for the purpose
of securing the foundations. As construction was possible only on the
cantilever principle from either side, facilities had to be provided
for the transportation of material as it was brought up by the railway,
from the south to the opposite cliff, and for this purpose an overhead
cableway was slung across the gorge. This vehicle of transport was
employed not only for the building of the bridge, but also for the
conveyance of other necessities for the railway, as the latter was
pushed ahead from the north bank while the bridge was being erected.
Workmen were also slung across the gorge by this means in a little
cage, and occasionally visitors who were anxious to experience a new
sensation made the trip at a cost of 10_s._, or $2.50 per head.
[Illustration:
_Photo by courtesy of Cleveland Engineering & Bridge-Building
Co., Darlington_]
THE GREATEST BRIDGE IN THE WORLD
The steel link springing in a single span of 500 feet from one cliff
to the other over the Zambesi River just below the Victoria Falls. The
trains pass across the gorge 420 feet above low water. Observe the net
which was suspended below to catch falling tools and workmen.]
One feature of the undertaking was the extreme care taken to protect
the workmen from certain death in the river below if they slipped from
their precarious perches in mid-air. A heavy, strong net was slung
across the chasm beneath the actual working point to catch “boys and
tools should they inadvertently drop.” The two ribs of steel were
pushed outwards from either bank, and finally met in the centre, where
the final bolts, securing first the two sections of the bottom members
together, were slipped in without any untoward incident. At the point
where the maze of steel springs from the cliff-face the bridge measures
105 feet from the bottom to the top member, while at the crown of the
arch the depth is 15 feet. The width at the rail-level is 30 feet,
while the bottom curved steel ribs, at the point where they are secured
to the rock, are about 54 feet apart.
[Illustration: SETTING UP THE WORLD’S RAILWAY BUILDING RECORD IN AFRICA
Natives laying 5¾ miles of track in 10 hours, on the Cape to Cairo
Railway.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account