This was not a simple enterprise, especially under conditions which
did not lend themselves to the expenditure of a large sum of money.
An easy graded line was imperative, and the surveyors had to search
diligently for such a route, because a range of hills breaks away from
the northern edge of the Abyssinian plateau, to run parallel with the
coast-line of the Red Sea to the Gulf of Suez. Investigations along the
coast resulted in Suakin, 305 miles distant from Atbara, being selected
as the sea terminus, and the surveyors succeeded in securing a location
giving no banks heavier than one per cent., and with no curves of a
sharper radius than 1,155 feet.
As the constructional engineers were confronted with some heavy work
shortly after leaving Suakin, in order to overcome the coast range,
building was commenced from both ends of the line simultaneously. This
procedure, however, did not prove entirely satisfactory, owing to the
cost and delay in bringing material down from Alexandria to Atbara,
so when the engineers at the Suakin end had subjugated their obstacle
and the material could be landed easily from vessels and hurried to
the railhead, operations were suspended from Atbara. The remoteness of
Suakin, however, produced individual handicaps, the greatest of which
was in regard to labour. The scattered natives were given employment,
but as they were unfamiliar with the tools and methods they did not
prove successful, and large numbers of Egyptians who had toiled on the
other lines were shipped to the Red Sea terminus. They were housed in
military tents, and a stranger happening suddenly upon a railway camp
might have been pardoned for labouring under the impression that he had
alighted upon an invading army under canvas, because the tents were
pitched in such regular rows as to indicate military occupation.
The mountains occasioned some little anxiety owing to the damage that
was caused by wash-outs due to the heavy rain, but these were soon
mastered. This abundance of water later on gave place to extreme
scarcity, for when the constructional forces had penetrated the heart
of the desert, this commodity was found only with great difficulty and
by infinite labour.
Despite these drawbacks, however, the 305 miles of line were laid and
opened for traffic within the short space of 14 months, which testifies
to the high standard of the constructional organisation and the energy
with which the undertaking was pushed forward. The significance of
this branch from the Nile to the sea was revealed instantly, but
unfortunately it was realised that the terminal point on the coast
left much to be desired. Further investigation revealed a better site
for a harbour 50 miles north of Suakin, and this point, now known as
Port Sudan, is the terminus of the line, the harbour being equipped
with modern facilities for handling traffic between ship and railway.
The new port is connected by rail with Suakin, however, which is being
retained as an outlet.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account