The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
Thereupon he evolved a plan to throw heavy iron girders in the manner
of rafters across the gulch, to anchor their ends to the solid rock,
and then to suspend the bridge carrying the metals from this structure
in such a way that one side abutted against the wall. The more he
pondered, the more convinced he became of its practicability, despite
the fact that it was something entirely new to railway engineering.
Being intimately acquainted with the late Mr. C. Shaler Smith, who at
that time was one of the foremost consulting bridge-engineers in the
country, he communicated his plans to him. The consulting engineer
was interested, and arranged to accompany the designer to the site
to judge the feasibility of the scheme at first hand, and after
acquainting himself with the prevailing conditions. As a result of this
investigation, Mr. Smith concurred in the method of spanning the gap,
and there and then the arrangements for carrying out the work were
commenced.
It was realised that the task was somewhat delicate, and Mr. Robinson
accordingly entrusted the preliminary operations to Mr. J. O. Osgood,
who was appointed Division Engineer on this section of the railway. Mr.
Osgood carried out the whole of the surveys for his chief personally to
facilitate the accurate design and details of the whole structure.
[Illustration: THE RAILWAY TWO MILES ABOVE THE SEA
The Denver and Rio Grande at the summit of Marshall Pass. The sinuous
route of the line may be followed for miles.]
The surveyor related to me that when he first entered the canyon no
one had ever traversed the gorge at that point, except on the ice, for
the simple reason that it was impassable. Nor could one get across by
clambering along the rock face where the line was to go, as it was too
steep. The situation was first reconnoitred from all practicable points
of vantage. Then, in order to complete the essential preliminary work,
he caused a narrow pathway--nothing more than a ledge, from 12 to 18
inches in width--to be hewn in the cliff above the site, from which he
made his final surveys.
[Illustration: A “DOUBLE-HEADER,” CLIMBING THE CLIFF OF ANIMAS CANYON
ON THE DENVER AND RIO GRANDE RAILWAY]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account