When Boulder River canyon was threaded the rise to the Continental
Divide commenced. The precise point at which this should be effected
demanded repeated surveying, and some time passed before the engineers
found the shortest and easiest path through the range. This was by
means of a tunnel through the summit. A heavy piece of work was
advocated--2½ miles in length--but as considerable time would be
required for its completion, it was decided to take the metals right
over the crests, with a temporary line of 28 miles, in order to proceed
with the grade and to open up the country beyond, leaving the boring
of the tunnel till a later date. Consequently, the track was carried
through Rollins Pass, 11,600 feet above the level of the sea, through a
world of perpetual snow.
[Illustration: A DEEP CUTTING]
[Illustration:
[_See page 180_
BORING ONE OF THE TEN TUNNELS
Cutting out the “Great Zigzag” on the New South Wales Government
Railway.]
To lift the line over that summit proved a tremendous task: it involved
the laying out of tremendous curves and wide, sweeping loops. When
built, it was quite as difficult to keep open during the winter months,
when the Rockies are swept with terrific blizzards, which bury the
steel highway deeply beneath hills of snow. Yet arrangements were
completed to meet this emergency. A rotary snow-plough, the biggest and
most powerful of its type that ever had been designed, was acquired.
With this huge machine the snow-gangs were out from morning to night,
but they kept that narrow channel of communication clear, though it was
almost a hopeless task at times.
While the railway was being pushed on from the western side of the
range, the boring of the tunnel was taken in hand. It was urgent, for
it reduced the summit, 2,200 feet below Rollins Pass, the portals
of the tunnel being 9,930 feet above the sea on either side, rising
therefrom at 1 in 400 to the tunnel’s centre line.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account