The Railway Conquest of the WorldTalbot, Frederick Arthur Ambrose
History
The Railway Conquest of the World
Talbot, Frederick Arthur Ambrose
Railroad engineering -- History; Railroads -- History
Gaining the top of the spur, the railway continues a gentle ascent
until it notches an altitude of 3,658 feet, when the descent of the
western slope commences. The Lithgow valley is the objective, and the
precipice tumbles down suddenly for 600 feet. To carry the line down
the mountain-side appeared impossible, and when the engineer-in-chief,
the late Mr. John Whitton, surveyed the scene, to say that he was
perturbed fails to express his thoughts adequately. He could overcome
the descent fairly easily if he were permitted to carry out tunnelling
operations, whereby he would secure both easy grades and curves. But he
was overruled. Tunnelling was considered too expensive and could not be
countenanced; in fact, the whole conquest of the mountains provoked a
long-drawn-out and bitter controversy.
The general attitude towards railways, and the slight knowledge
concerning their construction and operation in those early days,
is afforded from the engineer-in-chief’s struggle with the
Governor-General for permission to follow his own inclinations, which,
as he pointed out, might entail heavy initial expenditure, but would
pay in the long run. When the scheme was unfolded and the engineer
admitted that the work, however accomplished, must prove costly, the
Governor-General pointed out that a highroad had been built over the
mountains for pedestrian and wagon traffic. Consequently he suggested
that this channel should be used, that the lines should be laid in the
middle of the road, and that the trains should be hauled by horses! The
engineer had considerable difficulty, and had to resort to prolonged
communications and lengthy explanations, to impress upon the official
mind that the locomotive was the best means of hauling trains. He
became so insistent, and persecuted his demands so relentlessly that
the Governor-General, probably sick at heart over the whole thing, gave
way at last to the engineer’s importunities, but stipulated that the
constructional cost should not exceed £20,000, or $100,000, per mile.
By imposing this financial drag the official possibly thought
that he had discomfited the engineer. But this was by no means
the case. Certainly it ruled tunnelling out of consideration as a
means of overcoming difficulty, but it only served to stimulate the
engineer-in-chief to something more startling. As he could not make his
way from the summit to the lower level by the direct route he decided
to saw his way down the precipice. The rocky wall rose up for about 470
feet so steeply as to defy a mountain goat to secure a foothold. The
surveyors had to be lowered from the top by means of ropes and chains
to carry out their tasks with the transit and level to plot the path
for the line. Here and there were wide, deep V-shaped rifts breaking
the profile of the precipice. Massive arches in masonry were thrown
across these obstructions, and a path was cut in the side of the cliff
to carry the track.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account